Analisis Manajemen Risiko Proyek Telekomunikasi di Perusahaan Kontraktor Telekomunikasi Indonesia = Risk Management in Telecommunication Project, Case Study : Telecommunication Contractor Company in Indonesia.

Anindya Julianto; Zulkarnain, supervisor; Romadhani Ardi, supervisor; Isti Surjandari Prajitno, examiner; Teuku Yuri M. Zagloel, examiner (Fakultas Teknik Universitas Indonesia , 2020)

 Abstrak

ABSTRAK
Menentukan strategi yang tepat membuat perencanaan proyek penting berdasarkan perjanjian kerja, perjanjian itu dibuat untuk melindungi kedua belah pihak dalam melaksanakan pekerjaan. Tujuan dari penelitian ini adalah untuk mengidentifikasi kerangka kerja manajemen risiko dari sektor kontraktor telekomunikasi di Indonesia. Sebagian besar perusahaan telekomunikasi telah menerapkan sistem pembayaran ditunda berdasarkan kesepakatan. Proses penelitian ini mengembangkan kerangka kerja, evaluasi, dan mitigasi. Penelitian ini telah dilakukan dari penelitian sebelumnya terkait dengan risiko proyek dan manajemen risiko dalam perspektif kontraktor untuk mengembangkan kerangka kerja awal. Data dibangun dari penelitian sebelumnya dan sampel diambil dari beberapa perusahaan sejenis. Pendekatan kuantitatif yaitu survei dan wawancara ahli untuk mengkonfirmasi kerangka awal kemudian divalidasi dengan forum diskusi kelompok. penelitian ini diharapkan dapat mengetahui apa risiko dan mengurangi tingkat risiko tertinggi dengan mitigasi risiko. Penelitian ini mengusulkan kepada praktisi untuk mengelola rencana proyek dengan mempertimbangkan risiko proyek dan juga untuk para pemangku kepentingan atau investor untuk memutuskan investasi pada proyek ini.

ABSTRACT
Determine the right strategy of make project planning is important based on work agreement, the agreement was made to protect both parties in carrying out the work. The aim of this paper is to identify risk management framework for telecommunication contractor sector in Indonesia. Most of telecommunication companies have applied with postpone paymen system by agreement. The process of this paper is developing the framework, evaluate, and mitigation. This paper has been conducted from previous research related with project risk and risk management in contractor perspective to develop initial framework. Data was generated from previous research and sample was taken from some similar companies. The quantitative approach which are survey and expert interview to confirm the initial framework then validating by forum group discussion. This paper expected to find out what the risk and reduce the highest risk level with risk mitigation. This paper proposed to practitioners for manage the project plan by considering project risk and also for stakeholders or investor to decide investment on this project.

 File Digital: 1

Shelf
 T-Anindya Julianto.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia , 2020
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 39 pages : illustration ; 28 cm. + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-21-134359554 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20505330