Pengembangan standar Work Breakdown Structure (WBS) berbasis risiko untuk meningkatkan kinerja waktu pada proyek konstruksi kereta cepat = Development of risk-based standardized Work Breakdown Structure (WBS) to improve time performance of high-speed railway construction project
Didik Bintoro Jati;
Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Fadhilah Muslim, examiner; Rossy Armyn Machfudiyanto, examiner
(Fakultas Teknik Universitas Indonesia, 2020)
|
Seluruh rangkaian aktivitas pekerjaan pada suatu proyek konstruksi dapat mengalami gangguan yang dikarenakan oleh berbagai hal, yang pada akhirnya tentu dapat mengakibatkan terjadinya keterlambatan penyelesaian pekerjaan. Identifikasi dan analisis awal potensi risiko pada setiap paket pekerjaan, metode pelaksanaan, aktivitas pekerjaan, dansumber daya yang ada pada Work Breakdown Structure (WBS) dapat mencegah terjadinyaketerlambatan penyelesaian pekerjaan. Dengan demikian kebutuhan terhadap standarisasi WBS sangat penting dalam menyajikan penilaian risiko, penyebab, dampak, dan tindak lanjutyang timbul. Tujuan penelitian ini adalah untuk mengembangkan standar WBS berbasis risiko dalam meningkatkan kinerja waktu pada proyek konstruksi kereta cepat. Hasil dari penelitian ini adalah standar WBS konstruksi kereta cepat, variable risiko dominan yang berpengaruh terhadap kinerja waktu pelaksanaan pekerjaan, dan rekomendasi pengembangan standar WBS berbasis risiko, sebagai suatu upaya dalam meningkatkan kinerja waktu pada proyek konstruksi kereta cepat. The whole series of work activities on a construction project can be disrupted due to various things, which in turn can certainly lead to delays in completion of work. Initial identification and analysis of potential risks in each work package, construction methods, work activities, and resources available in the Work Breakdown Structure (WBS) can prevent delays in completion of work. Thus the need for WBS standardization is very important in presenting risk assessments, causes, impacts, and follow-ups that arise. The purpose of this study is to develop a risk-based standardized WBS in improving time performance on highspeed railway construction projects. The results of this study are a standardized WBS for highspeed railway construction, dominant risk variables that affect the time performance of construction work, and recommendations for the development of risk-based standardized WBS, as an effort to improve time performance on highspeed railway construction projects. |
![]()
|
No. Panggil : | T-pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2020 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource (rdacarries) |
Deskripsi Fisik : | xviii, 251 pages : illustration ; appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-pdf | 15-22-13806953 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20505952 |