:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Evaluasi Pembuatan dan Pengujian Risk Control Matrix atas Business Process Improvement pada Aktivitas Procurement di PT CDR = The Evaluation of Design and Testing Process of Risk Control Matrix on Business Process Improvement towards Procurement Activity in PT CDR

Silitonga, Aldo Paian Augustinus; Vitria indriani, supervisor; Harahap, Siti Nurwahyuningsih, examiner; Vera Diyanty, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2019)

 Abstrak

Tujuan laporan magang ini adalah untuk mengevaluasi proses bisnis pengadaan barang di PT CDR dan mengevaluasi pembuatan dan pengujian desain dari Risk Control Matrix yang dilakukan KAP Drake Indonesia (nama disamarkan) dalam proyek yang disebut Business Process Improvement terhadap aktivitas Pengadaan Barang di PT CDR. Proyek Business Process Improvement ini dimulai dari analisis atas praktik saat ini, identifikasi dan penilaian risiko, hingga rekomendasi untuk aktivitas pengadaan barang. Proses pengadaan barang PT CDR dinilai masih sangat berpotensi memungkinkan timbulnya risiko dan berdampak pada kerugian finansial perusahaan. Untuk mengatasi risiko-risiko tersebut, dilakukan penataan proses pengadaan barang yang dikerjakan melalui analisis risiko yang terdiri dari 2 tahapan, yaitu pembuatan desain dan pengujian Risk Control Matrix. Hasil evaluasi menunjukkan bahwa praktik perbaikan proses bisnis yang dilakukan KAP Drake Indonesia sudah dijalankan sesuai dengan tujuan kontrol internal untuk meningkatkan efektivitas operasi perusahaan. Namun, terdapat beberapa fitur pada Risk Control Matrix yang perlu ditambahkan, salah satunya komponen pengukuran level risiko dalam rangka melihat potensi risiko yang berpengaruh pada aktivitas pengadaan barang di PT CDR.

The objective of this internship report is to evaluate the procurement process of PT CDR and evaluate the design and testing process of the Risk Control Matrix performed by Drake Indonesia – Accounting Firm (name is disguised) through a project called Business Process Improvement on the procurement activity of PT CDR. The Business Process Improvement project is started from the analysis of current practice, risk identification and risk assessment, to the recommendation for the procurement activity. The current practice is considered having the likelihood to affect other risk to be occured and may affect to the company’s financial loss. To address those risks, the restructuring process on the procurement activities is done by making risk analysis that consist of 2 steps, the design process and testing process of Risk Control Matrix. The evaluation result shows that the practice performed by Drake Indonesia, the business process improvement, is aligned with the internal control objective, to increase the effectiveness of operation in PT CDR. However, there are some features in the Risk Control Matrix that need to be added, one of which is risk level measurement component, in order to capture the potential risks that affect the procurement activity in PT CDR.

 File Digital: 1

Shelf
 TA-Aldo Paian Augustinus Silitonga.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2019
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiv, 58 pages: illustration; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-Pdf 16-22-65185123 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20508178