Mekanisme Manajemen Lingkup untuk Mengurangi Keterlambatan Proyek: Studi Kasus PT Kreatif Dinamika Integrasi = Scope of Management Mechanism to Reduce Project Delay: A Case Study of PT Kreatif Dinamika Integrasi

Prima Widyaningrum; Bob Hardian Syahbuddin, supervisor; Riri Satria, examiner; Wahyu Catur Wibowo, examiner (Fakultas Ilmu Komputer Universitas Indonesia , 2020)

 Abstrak

PT. Kreatif Dinamika Integrasi merupakan perusahaan yang menyediakan solusi industri, aplikasi bergerak dan solusi lainnya. Implementasi solusi yang telah disepakati oleh pelanggan memerlukan waktu pengerjaan yang berbeda-beda dalam suatu proyek. Tingkat keberhasilan proyek diukur dari kesesuaian batasan ruang lingkup, ketepatan waktu, sesuai anggaran, kualitas, sumber daya dan risiko yang disepakati. Perubahan lingkup dan permintaan perubahan yang tidak dikontrol menyebabkan proyek tidak selesai tepat waktu yang berdampak pada anggaran yang dikeluarkan dan mengganggu aliran kas dari perusahaan. Berdasarkan permasalahan yang ada, penelitian ini diharapkan menghasilkan mekanisme kontrol terhadap lingkup dan perubahan pada proyek. Penelitian bersifat kualitatif dengan pendekatan adaptif. PMBOK digunakan untuk melakukan analisis pada mekanisme yang sudah ada sehingga ditemukan area-area yang dapat diperbaiki. Hasil dari analisa ditemukan bahwa perusahaan belum memiliki standar prosedur mengenai mekanisme manajemen lingkup dan mekanisme permintaan perubahan serta kurang maksimalnya proses pemantauan lingkup proyek, sehingga penulis membuat usulan model manajemen lingkup dan mekanisme permintaan perubahan berdasarkan kebutuhan dan masalah organisasi dengan melakukan kustomisasi dari praktik terbaik menjadi rekomendasi mekanisme manajemen lingkup perusahaan, selain itu peneliti juga melakukan usulan penggunaan tools untuk membantu memantau progres dari detail lingkup yang ada selama proyek.

PT Kreatif Dinamika Integrasi is a company that provides industrial solutions, mobile applications and other solutions. Implementation of the solution agreed upon by the customer requires different processing times for a project. The level of success of the project is measured by the suitability of the scope, time, budget, quality, resources and risks. Changes in scope that are not controlled cause the project is not completed on time which impact on the budget issued and disrupts cash flow from the company. Based on the existing problems, this research expected to produce a control mechanism for management scope. Research using qualitative methodology with adaptive approach. PMBOK 6th is used to analyze existing mechanisms so that areas that can be improved can be found. The results of the analysis found that the company does not yet have a standard procedure regarding the scope management mechanism and the change request mechanism and lack of monitoring scope project, so the authors make a proposed scope management model and the change request machanism based on the needs and problems of the organization by customizing the best practices into the recommendations of the company’s scope management mechanism. The author also proposes the use of tools to help monitor the progress of the detailed scope available during the project. 

 File Digital: 1

Shelf
 TA-Prima Widyaningrum.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia , 2020
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 203 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-Pdf 16-22-55912467 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20510847