:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Studi Analisis Perbandingan Kelayakan Perpanjangan Kontrak Blok X dengan Sistem Production Sharing Contract (PSC) dan Gross Split = Comparative Analysis Study of Contract Extension Feasibility Block X Using Production Sharing Contract and Gross Split System

Fataninda Dwi Kesumaputri; Eva Fathul Karamah, supervisor; Sutrasno Kartohardjono, examiner; Yuliusman, examiner; Apriliana Cahya Khayrani, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Indonesia telah menggunakan sistem Kontrak Bagi Hasil atau biasa disebut dengan Production Sharing Contract (PSC) sejak 1966. Pada tahun 2017, Kementerian Energi dan Sumber Daya Mineral mengeluarkan Peraturan Menteri (Permen) ESDM No. 8 Tahun 2017 tentang Kontrak Bagi Hasil Gross splitsebagai penanda perubahan sistem Kontrak dari PSC ke Gross split. Blok X adalah lapangan penghasil minyak milik suatu Kontraktor Kontrak Kerja Sama Asing yang habis masa kontraknya di tahun 2018. Sehubungan dengan sistem Kontrak yang baru, Blok X dianalisa dengan menggunakan PSC dan Gross Splituntuk membandingkan Pendapatan Negara dan Pendapatan Kontraktor dengan menggunakan kedua metode ini. Hasil yang didapat adalah dengan menggunakan metode Gross Splitpendapatan kontraktor akan lebih meningkat dibandingkan dengan menggunakan metode PSC dikarenakan persentase pembagian Gross Splityang bersifat dinamis dengan skenario terbaik yang didapat adalah skenario 2 untuk nilai NPV M$ 1,652,469; POT 1.1 tahun dan DPIR 8.6

Indonesia has been using Production Sharing Contract (PSC) Cost Recovery as its oil and gas contract regulation since 1966. In 2017, Minister of Energy and Mineral Resources released new regulation which set new oil and gas contract regulation in Indonesia from PSC Cost Recovery to Gross split (GS). Block X, an oil and gas block owned by International Oil Company operating in Indonesia, end its contract period in 2018. Regarding the new regulation, contract system of Block X is analysed by using PSC and GS to compare Government Take and Contractor Take result by using these methods. The final result is by using Gross split the Contract Take will be higher than using PSC because Gross split has more dynamic variable split with the Scenario 2 as the best scenario for NPV M$ 1,652,469; POT 1.1 years and DPIR 8.6.

 File Digital: 1

Shelf
 T-Fataninda Dwi Kesumaputri.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource (rdacarries)
Deskripsi Fisik : xii, 48 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-21-71496371 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20513640