:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis skala prioritas tindakan pencegahan dan perbaikan dalam integrasi manajemen sistem jasa konstruksi = Priority scale analysis of preventive and corrective measures in the integrated management systems of construction services.

Andita Linati Putri; Leni Sagita Riantini, supervisor; Yusuf Latief, supervisor; Rossy Armyn Machfudiyanto, examiner; Fadhilah Muslim, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Sektor jasa konstruksi merupakan salah satu sektor terpenting yang memberikan kontribusi terbesar dalam pembangunan nasional namun untuk mencapai tujuan tersebut diperlukan kinerja organisasi perusahaan yang baik. Kinerja yang baik merupakan indikator unggulnya perusahaan, pengukuran kinerja dianggap penting untuk mengevaluasi pengendalian perusahaan sehingga membantu menetapkan standar, memajukan, dan mengoptimalkan kinerja organisasi. Dengan mengintegrasikan Sistem Manajemen Mutu, Lingkungan, dan K3 kedalam satu sistem manajemen yang terpadu, dapat memudahkan perusahaan untuk meningkatkan kualitas sistem manajemen sehingga lebih mudah mencapai tujuan secara efektif dan efisien. Mengintegrasikan ketiga sistem tersebut tidak luput dari risiko dalam integrasi proses sehingga dibutuhkan pengendalian risiko secara prefentif dan korektif yang mungkin juga akan mempengaruhi kinerja organisasi perusahaan. Penelitian ini bertujuan untuk mengetahui hubungan antara strategi pengendalian risiko dan kinerja organisasi. Metode penelitian yang digunakan merupakan studi kasus dengan kuesioner dan validasi konten serta konstrak. Hasil penelitian merupakan analisis skala prioritas strategi pengelolaan risiko secara prefentif dan korektif dalam jasa konstruksi kontraktor.

The construction sector is one of the most important sectors that provide the largest contribution to national development, but to achieve so a good corporate organizational performance is required. Good performance is an indikator of a company's superiority, performance measurement is considered important for evaluating company controls so that it helps to set standards, advance, and optimize organizational performance. By integrating the Quality Management System, Environment, and OHS into one integrated management system, it can make it easier for companies to improve the quality of the management system so that it is easier to achieve goals effectively and efficiently. Integrating the three systems does not escape risks in process integration so that preventive and corrective risk control is needed which may also affect the company's organizational performance. This study aims to determine the relationship between risk control strategies and organizational performance. The research method used is a case study with a questionnaire and content validation and construct. The result of this research is the priority scale analysis of preventive and corrective measures in the integrated management systems of construction services.

 File Digital: 1

Shelf
 S-Andita Linati Putri.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 253 pages: illustration; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia.
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-pdf 14-21-86865036 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20513762