:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Optimasi proses seleksi proyek dengan menggunakan metode analytic hierarchy process (AHP): Sebuah studi penerapan project portfolio management pada PT.X = Optimization of the project selection process using analytic hierarchy process method: A study of application of project portfolio management in PT.X.

Ario Cahya Gemilang; Leni Sagita Riantini, supervisor; Agung Setyo Supriyanto; Ayomi Dita Rarasati, examiner; Rossy Armyn Machfudiyanto, examiner; Wisnu Isvara, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Indonesia merupakan negara dengan market otomotif terbesar di Asia Tenggara, tercatat lebih dari satu juta unit mobil terjual di Indonesia pada 2018. PT X adalah salah satu perusahaan distributor kendaraan di Indonesia. PT X memiliki 38 dealer di seluruh Indonesia yang melayani jasa penjualan dan servis kendaraan. Setiap tahun PT X memiliki proyek untuk dilelang. Proyek tersebut dimiliki dan dijalankan oleh dealer yang ditunjuk oleh PT X. Dari seluruh proyek yang dibangun dan dioperasikan banyak yang tidak optimal menjalankan fungsinya sesuai dengan target. Tujuan dari penelitian ini adalah melakukan optimasi proses seleksi proyek dengan menggunakan metode analytic hierarchy process (AHP), dengan penerapan project portfolio management pada PT X. Hasil penelitian menunjukan bahwa terdapat 5 kriteria dengan bobot prioritas yang paling berpengaruh terhadap dipilihnya sebuah perusahaan untuk menjadi pemenang seleksi proyek. Kriteria tersebut dengan masing – masing bobot prioritas adalah kriteria keuangan (34%), pengelolaan bisnis (28%), sumber daya manusia (18%), competitiveness improvement (12%) dan kemampuan mengelola proyek (8%). PT X dapat menggunakan sistem seleksi baru dengan scoring model berbasis AHP sehingga kinerja proyek dan kinerja operasional dealer dapat tercapai optimal.

Indonesia is the country with the largest automotive market in Southeast Asia, with more than one million cars sold in Indonesia in 2018. PT X is one of the vehicle distributor companies in Indonesia. PT X has 38 dealers in Indonesia that provide sales and service services for vehicles. Every year PT X has a project up for auction. The project is owned and executed by a dealer appointed by PT X. Of all the projects built and operated, many did not perform their functions optimally according to the target. The purpose of this study is to optimize the project selection process using the analytic hierarchy process (ahp) method, with the application of project portfolio management at PT X. The results show that there are 5 criteria with priority weights that most influence the selection of a company to be the winner of the project selection. The criteria with each priority weight are financial criteria (34%), business management (28%), human resources (18%), competitiveness improvement (12%) and the ability to manage projects (8%). PT X can use a new selection system with AHP-based scoring model so that project performance and dealer operational performance can be achieved optimally.

 File Digital: 1

Shelf
 T-Ario Cahya Gemilang.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2021
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xx, 140 pages : illustration ; appendix.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia.
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-22-30289833 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20514036