Pengembangan proses perencanaan pada proyek infrastruktur dengan kontrak rancang bangun berbasis PMBOK untuk meningkatkan kinerja waktu (Studi kasus PT. X) = Development of planning processes in infrastructure projects with design and build contract based on PMBOK to improve time performance (Case study PT. X).
Ardian Vidianto Amidarmo;
Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner
(Fakultas Teknik Universitas Indonesia, 2021)
|
Pelaksanaan proyek konstruksi infrastruktur dengan sistem kontrak design and build sedang banyak dilakukan belakangan ini dan sangat membutuhkan strategi pengelolaan yang cermat dari tahap perencanaan sampai tahap akhir pelaksanaan proyek. Masalahmasalah yang sering dihadapi dalam pelaksanaan proyek ini pada umumnya adalah masalah penerapan manajemen proyek diantara bagian-bagian divisi yang saling berkaitan satu sama lain dan bisa mempengaruhi produktivitas kerja. Tujuan penulisan ini adalah untuk memberikan masukan kepada para kontraktor yang mengerjakan proyek dengan tipe tersebut, agar dapat meningkatkan perencanaan manajemen proyek yang telah dimiliki menjadi lebih optimal dan efektif. Pada penelitian ini didapatkan total pengembangan kegiatan adalah 21 kegiatan dengan 2 pengembangan kegiatan berbasis PMBOK 2017, dan 19 kegiatan pengembangan berbasis risiko. The construction of infrastructure projects with design and build contract system is being carried out lately and urgently requires careful management strategies from the planning stage to the final stages of project implementation. The problems that are often faced in the implementation of this project in general is the implementation of project management between divisions of the division that are interrelated with one another and can affect work productivity. The purpose of this paper is to provide input to contractor who worked on projects of this type, in order to improve planning process in project management that have been owned to be more optimal and effective. In this study, the total development activities were 21 activities with 2 development activities based on PMBOK 2017, and 19 risk-based development activities. |
T-Ardian Vidianto Amidarmo.pdf :: Unduh
|
No. Panggil : | T-pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Jakarta: Fakultas Teknik Universitas Indonesia, 2021 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xv, 182 pages : illustration ; appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-pdf | 15-22-97169580 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20517178 |