:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis hubungan komponen biaya SMKK dan komponen AHSP pada proyek konstruksi jalan tol untuk meningkatkan kinerja keselamatan konstruksi = Analysis of the relationship of cost components of SMKK and AHSP components in toll road construction projects to increase construction safety performance

Hanesti Adifa Rahmat; Rossy Armyn Machfudiyanto, supervisor; Ratih Fitriani, supervisor; Leni Sagita Riantini, examiner; Setyo Supriyadi Sipadi, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Angka kecelakaan konstruksi di Indonesia tergolong tinggi, termasuk pada konstruksi Jalan Tol. Kecelakaan pada proyek konstruksi di Indonesia menunjukkan bahwa selain penerapan Sistem Manajemen Keselamatan Konstruksi di Indonesia masih terabaikan, kecelakaan konstruksi juga disebabkan oleh kurangnya biaya dalam Sistem Manajemen Keselamatan Konstruksi. Proyek konstruksi jalan tol telah menetapkan anggaran biaya SMKK sebesar 0,5-1,5 % dan dinilai cukup rendah karena berada dibawah 3 % dari biaya proyek. Metode statistik dengan SPSS versi 26 digunakan untuk meneliti hubungan dari komponen Biaya SMKK, komponen AHSP, dan Kinerja Keselamatan Konstruksi pada Proyek Jalan Tol. Hasil dari penelitian akan menunjukkan komponen yang paling berpengaruh pada kesadaran keselamatan adalah papan jalur evakuasi, Alat Pemadam Api Ringan (APAR), program inspeksi dan audit internal. Komponen yang paling berpengaruh pada manajemen disiplin diri adalah induksi keselamatan konstruksi, tali keselamatan (lifeline), dan biaya alat. Komponen yang paling berpengaruh pada pengendalian kecelakaan adalah Alat Pemadam Api Ringan (APAR), program inspeksi dan audit internal, serta biaya material.

The number of construction accidents in Indonesia is quite high, including the construction of toll roads. Accidents on construction projects in Indonesia show that in addition to the neglect of the implementation of the Construction Safety Management System in Indonesia, construction accidents are also caused by a lack of cost in the Construction Safety Management System. The toll road construction project has set an SMKK cost budget of 0.5-1.5% and is considered quite low because it is below 3% of the project cost. Statistical methods were used to examine the relationship of Cost Components of SMKK, Components of AHSP, and Construction Safety Performance on Toll Road Projects. The results of the study show that the components that have the most influence on safety awareness are evacuation route boards, fire extinguishers, inspection programs and internal audits. The components that have the most influence on self-discipline management are construction safety induction, lifeline, and tool costs. The components that have the most influence on accident control are fire extinguishers, inspection and internal audit programs, and material costs.

 File Digital: 1

Shelf
 S-Hanesti Adifa Rahmat.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2022
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 328 pages : illustrations ; 28 cm. + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-pdf 14-22-88227587 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20519093