Analisis Penerapan Lean Construction Sebagai Suatu Manajemen Biaya Proyek Konstruksi Perumahan (Studi Kasus Pada PT XYZ) = Lean Construction Design Application as a Residential Construction Project Cost Management (Case Study in PT XYZ)
Muthia Ulfa;
Dwi Hartanti, supervisor; Chaerul Djusman Djakman, examiner; Yan Rahadian, examiner
(Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2022)
|
Inefisiensi pada aktivitas dalam proyek konstruksi menciptakan pemborosan. Penelitian ini berfokus padaidentifikasi faktor-faktor pemborosan dari aktivitas dalam proyek konstruksi. Kemudian membentuk desain penerapan lean construction tools sebagai sarana meminimalkan pemborosan waktu proyek konstruksi perumahan di PT XYZ. Tujuan dari penelitian ini diharapkan menghasilkan rekomendasi tanggapan terhadap faktor-faktor pemborosan yang dapat terjadi pada pelaksanaan proyek konstruksi perumahan di PT XYZ untuk selanjutnya dilakukan penerapan manajemen proyek konstruksi dengan pendekatan lean construction. PT XYZ merupakan perusahaan subkontraktor proyek konstruksi yang jasa pekerjaanya dominan pada proyek konstruksi perumahan dengan skala kecil dan menengah. Waktu penyelesaian proyek menjadi faktor signifikan dalam penentuan keberhasilan proyek. Penelitian ini merupakan penelitian kualitatif dengan pendekatan studi kasus. Data diperoleh dengan pertanyaan tertulis dan wawancara mendalam dengan beberapa responden. Hasil penelitian menunjukkan terdapat 4 aktivitas yang tepat dikategorikan sebagai faktor pemborosan waktu dalam pelaksanaan proyek konstruksi perumahan. Dengan membentuk desain penerapan Last Planner System penghematan waktu dapat dihasilkan selama 3 hari dari total 120 hari kalender. Hasil penelitian juga menunjukkan kesiapan perusahaan dalam mengimplementasikan prinsip-prinsip lean construction menunjukkan nilai 3.5 dari skala 5 hal tersebut mengindikasikan prinsip-prinsip tersebut telah dinyatakan dalam setiap proyek namun jarang diterapkan dalam proyek yang dikerjakan Inefficient construction project operations produce waste. This research focuses on the identification of waste factors from activities in construction projects. Then form a design to apply lean construction tools to minimize the waste of time for housing construction projects at PT XYZ. This study aims to produce recommendations for responses to waste factors that can occur in housing construction projects at PT XYZ for further implementation of construction project management with a lean construction approach. PT XYZ is a construction project subcontractor whose work services dominate small and medium-scale residential construction projects. Project completion time is a significant factor in determining project success. This research is qualitative research with a case study approach. Data were obtained by written questions and in-depth interviews with several respondents. The results showed that four activities were rightly categorized as time-wasting factors in the implementation of housing construction projects. By designing the implementation of the Last Planner System, time savings can be generated for three days out of a total of 120 calendar days. The results also show the company's readiness to implement lean construction principles, showing a score of 3.5 out of 5, indicating that these principles have been stated in every project but are rarely applied in their projects. |
T-Muthia Ulfa.pdf :: Unduh
|
No. Panggil : | T-pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2022 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xiii, 104 pages : illustration + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-pdf | 15-23-12477995 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20521389 |