Evaluasi Kebijakan Permen PUPR 25/2020 tentang Rancang-Bangun Berbasis Pengembangan Standard Measurement Method pada pembangunan bangunan gedung negara untuk menurunkan dispute = Evaluation of the Minister of Public Works and Public Housing Policy 25/2020 concerning Design and Build Based on the Development of Standard Measurement Methods in the construction of state buildings to reduce dispute

Rima Restiana; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner; Wisnu Isvara, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Pekerjaan konstruksi Rancang Bangun (Design and Build) adalah seluruh pekerjaan yang berhubungan dengan pembangunan suatu bangunan yang menunjukkan integrasi penyediaan jasa antara Pekerjaan Konstruksi dengan Konsultansi Konstruksi. Penerapan metode rancang dan bangun dinilai dapat menghemat waktu yang cukup signifikan. Dalam penerapan kontrak terintegrasi rancang dan bangun, capaian suatu pekerjaan konstruksi didasari dengan penilaian pada tingkatan outcome (performance based), yaitu hanya melihat kesesuaian hasil pekerjaan dengan kriteria yang ditetapkan sedangkan metode audit yang digunakan oleh auditor pada tingkatan output dimana setiap volume item pekerjaan harus disampaikan beserta kewajaran harganya dan kemudian diperiksa secara unit price. Dengan adanya perbedaan persepsi antara penyedia jasa, pengguna jasa, maupun pihak auditor dalam pelaksanaan metode rancang bangun dapat mengakibatkan adanya sengketa klaim atau dispute. Terjadinya perbedaan persepsi seringkali diakibatkan karena tidak adanya standarisasi atau metode perhitungan pelaksanaan pekerjaan rancang dan bangun. Saat ini pelaksanaan kontrak rancang dan bangun diatur didalam Peraturan Menteri PUPR Nomor 25 Tahun 2020 yang merupakan pembaharuan dari Peraturan Menteri PUPR Nomor 1 Tahun 2020. Munculnya fenomena-fenomena terkait pelaksanaan kontrak terintegrasi rancang dan bangun mengakibatkan dampak yang cukup signifikan pada pelaksanaan metode kontrak rancang dan bangun seperti terjadinya perubahan nomenklatur Peraturan Menteri terkait kontrak terintegrasi rancang dan bangun yang berubah 3 (tiga) kali dalam jangka waktu 5 (lima) tahun. Melalui penyusunan tesis ini, penulis bertujuan untuk memberikan rekomendasi perbaikan kebijakan Peraturan Menteri PUPR Nomor 25 Tahun 2020 berbasis Standard Measurement Method pada Pembangunan Gedung Negara. Penelitian ini diawali dengan menyusun aspek dan aktifitas pada pelaksanaan kontrak terintegrasi rancang dan bangun. Kemudian dilanjutkan dengan mengidentifikasi permasalahan/ penyebab dispute disetiap aktifitas pada aspek pelaksanaan kontrak terintegrasi rancang dan bangun. Adapun metode penelitian yang digunakan adalah analisa arsip, studi literatur, kuesioner, analisa data berupa uji homogenitas, uji validitas, uji reabilitas, kemudian dilanjutkan dengan pengolahan data menggunakan perangkat lunak SmartPLS untuk mengetahui hubungan signifikansi permasalahan-permasalahan disetiap aktifitas yang dapat menyebabkan terjadinya dispute. Kemudian dilanjutkan dengan rekomendasi solusi untuk mengurangi dispute pada setiap aktifitas. Hasil akhir dari penelitian ini menunjukan bahwa aspek pelaksanaan kontrak terintegrasi rancang dan bangun mulai dari Perencanaan dan Persiapan Pengadaan, Pelelangan dan Kontrak, Pelaksanaan Konstruksi, Pemeriksaan dan Pengawasan (Audit), serta Serah Terima dan Pemeliharaan berpengaruh secara signifikan terhadap terjadinya dispute. Sehingga output yang dihasilkan dari penelitian ini berupa rekomendasi perbaikan kebijakan Permen PUPR Nomor 25 Tahun 2020 berbasis pengembangan Standard Measurement Method untuk menurunkan potensi terjadinya dispute atau sengketa dalam pelaksanaan proyek.

Design and Build is all work related to the construction that shows the integration of service provision between Construction Works and Consultancy. The application of design and build method is considered to be able to save significant time. In the application of design and build contract, the achievement of a construction work is based on an assessment at the outcome level (performance based), which is only seeing the suitability of the work results with the established criteria, while the audit method used by the auditor is at the output level where each volume of work items must be submitted. The existence of differences in perceptions between service providers, service users, and auditors in the implementation of the design and construction method causes a dispute. The occurrence of differences in perception is often caused by the absence of standardization or calculation methods for the implementation of design and construction work. The implementation of the design and build contract is regulated in the Minister of PUPR Regulation Number 25 of 2020 which is a renewal of the Minister of PUPR Regulation Number 1 of 2020. The emergence of phenomena related to the implementation of an integrated design and build contract resulted in a significant impact on the implementation of the design and build contract method, such as a change in the nomenclature of the Ministerial Regulation related to the integrated design and build contract which changed 3 (three) times within a period of 5 (five) years. The author aims to provide recommendations for policy improvements to the Minister of Public Works and Public Housing Regulation Number 25 of 2020 based on the Standard Measurement Method in the Construction of State Buildings. This research begins with compiling aspects and activities in the implementation of an integrated design and build contract. Then proceed with identifying the problems/causes of dispute in each activity in the implementation of design and build contract. The research methods used are archive analysis, literature study, questionnaires, data analysis in the form of homogeneity test, validity test, reliability test, then proceed using SmartPLS software to determine the significance relationship of the problems in each activity that can cause a dispute. Then proceed with the recommendation of solutions in each activity. The final result of this study shows that aspects of the implementation of an integrated design and construction contract starting from Procurement Planning and Preparation, Auctions and Contracts, Construction Implementation, Inspection and Supervision (Audit), as well as Handover and Maintenance have a significant effect on the occurrence of disputes. So that the output produced from this research is in the form of recommendations for improving the PUPR Ministerial Regulation Number 25 of 2020 based on the development of the Standard Measurement Method to reduce the potential of disputes in project implementation.

 File Digital: 1

Shelf
 T-Rima Restiana.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2022
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvii, 216 pages : illustrations ; 28 cm. + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-54959367 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20523956