:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Perbaikan Jalur Serat Optik Segmen Tentena - Petasia pada Jaringan Palapa Ring Paket Tengah = Fiber Optic Line Repair Tentena - Petasia Segment in Palapa Ring Middle Network

Hardy Lukius; Fitri Yuli Zulkifli, supervisor; Muhammad Salman, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Jaringan Serat Optik Palapa Ring Paket Tengah pada area Proyek 5 merupakan area yang sering mengalami insiden serat optik putus yang menyebabkan kualitas serat optik menjadi turun. Padahal area ini paling diminati oleh pelanggan dari sisi komersial sehingga perlu dilakukan perbaikan untuk meningkatkan kualitas jaringan serat optik. Pada laporan praktek keinsinyuran ini diajukan rencana perbaikan area Proyek 5 yang difokuskan pada satu segmen yaitu segmen Tentena – Petasia.
Kegiatan perbaikan dilakukan dengan terlebih dahulu mengumpulkan data yang dapat dijadikan bahan analisis. Data diambil dari hasil pengukuran di lapangan menggunakan alat ukur OPM, OTDR, dan melalui sistem NMS. Data kemudian diolah dan dianalisis sehingga didapatkan titik di mana saja diperlukan perbaikan. Kemudian dibuat rekomendasi dan estimasi anggaran untuk pelaksanaan kegiatan perbaikan.
Rekomendasi perbaikan yang diberikan terdiri dari sembilan titik perbaikan dengan total estimasi anggaran perbaikan sebesar 48,550,913 rupiah. Dua dari sembilan rekomendasi perbaikan telah dikerjakan sehingga persentase perkembangan perbaikan yaitu 11,1 %

Palapa Ring Middle Fiber Optic Network in Project 5 area is an area that often experiences fiber optic break incidents which causes the optical fiber quality to decrease. This area is most in demand by customers from the commercial side, so improvements need to be made to improve the quality of the fiber optic network. In this report, an improvement plan for the Project 5 area is proposed, which focuses on one segment, namely the Tentena – Petasia segment.
Repair activities are carried out by first collecting data that can be used as author's analysis material. Data is taken from the results of measurements in the field using OPM, OTDR, and through the NMS system. The data is then processed and analyzed so that points are obtained where improvements are needed. Then the authors make recommendations and budget estimation for the implementation of repair activities.
The recommendations for improvement given by the author consist of nine points of improvement with a total estimated repair budget of 48,550,913 rupiah. Two of the nine recommendations for improvement have been carried out so that the percentage of improvement progress is 11.1%

 File Digital: 1

Shelf
 PR-Hardy Lukius.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2022
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 47 pages: illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-23-54663821 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20526707