:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Studi perencanaan manajemen produksi dan inventori pada LOBP Tanjung Perak Pertamina UPPDN V Surabaya

Muhadi; Bambang Sugiarto, supervisor; Teuku Yuri M. Zagloel, supervisor (Fakultas Teknik Universitas Indonesia, 2000)

 Abstrak

Studi Perencanaan Manajemen Produksi dan Inventori (PIM) pada LOBP Tanjung Perak UPPDN V Surabaya adalah suatu studi evaluasi pelaksanaan yang dilaksanakan saat ini di LOBP Tanjung Perak terhadap prinsip-prinsip PIM MRP II dan kemungkinan penerapan PIM Solusi, sebagai pengembangan PIM saat ini dengan lebih memperkuat penerapan PlM MRP II.
Dalam studi ini juga dilakukan perhitungan uji coba penerapan PIM Solusi dan hasilnya dibandingkan dengan PIM saat ini. Pada perhitungan penerapan PIM Solusi dilakukan tahapan standar, yaitu mulai forecasting, production planning, master production scheduling, dan material requirement planning. Hasil perhitungan tersebut dibandingkan PIM saat ini dengan kondisi nyata pada bulan yang sama, yaitu bulan April 2000. Perbandingan tersebut meliputi faktor kelebihan stok, kekurangan stok, dan jumlah akhir material bahan baku.
Dari studi ini didapatkan hasil bahwa PIM saat ini telah menerapkan sebagian besar prinsip PIM MRP II dan dengan kondisi saat ini memungkinkan untuk lebih dikembangkan penerapan prinsip MRP II sebagai PIM Solusi. Dan dari perbandingan uji coba PIM Solusi menunjukkan kondisi yang lebih baik dari PIM saat ini apabila safety stock yang diambil adalah 0-75% dari rencana produksi.
Selain hasil studi di atas, hal penting yang perlu mendapat perhatian adalah penentuan besarnya safety stock (SS). Studi ini menjelaskan bahwa besar SS selain untuk menentukan besarnya pelayanan pelanggan, juga menentukan optimalisasi biaya produksi dan inventori dibandingkan biaya kekurangan produk.

The study of Production and inventory management planning (PIM) at LOBP Tanjung Perak UPPDN V Surabaya is the PIM evaluation study that has done at LOBP Tanjung Perak against PIMMRP II principals, and possibility to apply improvement PIM with more MRP II principals.
In this study, Improvement PIM is done as case to compare with existing PIM. The processes of improvement PIM follow the standard of MRP II are forecasting, production planning, master production scheduling, and material requirement planning. And the results will be comparing in over stock, shortage stock and volume of inventory with existing PIM at April 2000 realizations.
The results of this study show that the existing PIM have applied almost all of MRP principals, so that is possible to improve become PIM that base on all of MRP principals. And the result of evaluations gives a fact that the improvement PIM with safety stock 0 - 75% production planning is better than existing PIM.
The important thing that we can get from this study is that safety stock not only determine customer service level, but also production and inventory cost optimally to shortage product cost.

 File Digital: 9

Shelf
 T 4672-Studi perencanaan-Lampiran.pdf :: Unduh
 T 4672-Studi perencanaan-Abstrak.pdf :: Unduh
 T 4672-Studi perencanaan-Kesimpulan.pdf :: Unduh
 T 4672-Studi perencanaan-Literatur.pdf :: Unduh
 T 4672-Studi perencanaan-Pendahuluan.pdf :: Unduh
 T 4672-Studi perencanaan-Bibliografi.pdf :: Unduh
 T 4672-Studi perencanaan-HA.pdf :: Unduh
 T 4672-Studi perencanaan-Analisis.pdf :: Unduh
 T 4672-Studi perencanaan-Metodologi.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T4672
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2000
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 67 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T4672 15-19-599099793 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 71763