Peran PLG (Project Liaison Group) dalam keberhasilan operasi dan proyek ekspansi kilang yang berjalan bersamaan (Studi kasus LNG Train PT. X di Indonesia)

Hadi Daryono; Djoko Hartanto, supervisor; Tresna Priyana Soemardi, supervisor (Fakultas Teknik Universitas Indonesia, 1998)

 Abstrak

ABSTRAK
Perusahaan minyak milik pemerintah Indonesia PT-X mengelola beberapa jenis produk energi antara lain minyak bumi, gas dan Panas Bumi. Salah satu produknya, LNG telah menjadi komoditi yang sangat penting tidak saja bagi PT-X, tetapi bagi kesejahteraan seluruh bangsa Indonesia. Karena pertumbuhan yang pesat dari ekspor LNG maka proyek LNG train terus berkembang sampai saat ini.
Di dalam pengembangan kilang LNG maka didalam kegiatan kilang akan ada dua aktivitas yang berjalan bersamaan (concurrent) dengan objectivity yang berbeda. Kedua aktivitas itu adalah kegiatan operasi atau produksi kilang dan kegiatan proyek ekspansi didalamnya. Fenomena yang menarik disini adalah sangat diharapkan kedua aktivitas tersebut dapat berjalan bersamaan dan dikelola dengan suatu mekanisme sedemikian rupa tanpa menimbulkan konflik yang dapat memperburuk kinerja salah satu atau kedua-duanya sekaligus. Kedua aktivitas dapat menciptakan konflik didalam operasi kilang yang berlangsung dilokasi yang sama dengan proyek ekspansi. Penurunan kinerja dapat terjadi pada proyek, operasi/produksi atau kedua-duanya.
Upaya yang dilakukan PT-X dalam ekspansi kilang LNG nya adalah implementasi PLG yang anggotanya terdiri dari orang-orang yang sangat berpengalaman didalam operasi kilang LNG. Dalam studi ini PLG menjadi, fokusnya: Seberapa jauh peran PLG mengatasi konflik yang terjadi antara kedua aktifitas. Melalui model yang dikembangkan dianalisa peran PLG yang dinyatakan dan effektifitas proyek yang akan ditunjukkan oleh korelasi antara nilai rating (valuation) antara variabel input dan outputnya.
Hasil menunjukkan: implementasi PLG yang baik (diimplementasikan tahun 1986-1997) telah menunjukkan suatu sensitifitas (β) yang tinggi, sebaliknya tanpa PLG akan menunjukkan sensitifitas (β) yang rendah. Ini berarti PLG mampu menciptakan robust concurrent management, koordinasi yang sinergis, perbaikan sistem management mutu yang continue sebagai faktor kunci sukses dan akhirnya mampu meminimumkan konflik dan memaksimumkan kinerja.

ABSTRACT
Indonesian State Oil Company PT.X manages a wide variety of energy products i.e. Oil, Gas and Geothermal. Among the product, LNG has been a very important commodity not only to PT.X but also to the whole nation. Because of LNG export growth, LNG train project expansion will be continued.
In the LNG Plant expansion there will be two activities going on concurrently with different objectives. Those are running production / operation and expansion project activities. The interesting phenomena is the two activities must be running together and managed in such a way without any conflict which can diminish-each activity or the both performance. The two activities may create conflict in operation activities which is running at the same site of project activities.
The effort in the PT.X Refinery Expansion is the implementation of PLG (Project Liaison Group) consist of experience member selected from the operation. PLG is the focus of the study: How far the role of PLG overcame conflicts between the two activities. Through a developed model, PLG role is expressed in term of Production
Operation and Project Effectiveness which will be shown as the correlation between the valuation of rating of input and output variables.
The result show : A well implement PLG (implemented in 1996-1997) has shown a high sensitivity (β) correlation between the designed input and output variables and relatively low variation of continuos improvement.
In contrast, without PLG has shown a low / correlation. It means that PLG created robust concurrent management, synergic coordination, quality management system improvement as key success factors and finally minimize conflict and maximize performance.

 File Digital: 1

Shelf
 T1564-Hadi Daryono.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 1998
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : x, 54 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-17-548505721 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 78036