Optimalisasi waktu kerja instalasi bedah sentral RSUP Fatmawati Jakarta = Time optimalization in central surgery installation of Fatmawati General Hospital, Jakarta

Tati Suryati; Purnawan Junadi, supervisor; Soewarta Kosen, examiner; Yudi Budihardja, examiner; Sandi Iljanto, examiner; Amal Chalik Sjaaf, examiner (Program Pascasarjana Universitas Indonesia, 1997)

 Abstrak

Dengan adanya kemajuan IPTEK khususnya dibidang Kedokteran menyebabkan pengobatan melalui pembedahan menjadi berkembang spesialistik dan mahal, selain itu demand masyarakat terhadap tindakan pembedahan juga meningkat. Pada dasawarsa terakhir, dinegara maju dan berkembang ada kecenderungan penghematan dalam bidang pelayanan kesehatan utamanya rumah sakit, sehingga timbul gagasan untuk mengadakan sentralisasi unit-unit tertentu terutama unit sebagai cost centre diantaranya adalah kamar bedah. Hal tersebut diatas juga banyak mengundang penelitian tentang utilisasi dan efektifitas kamar bedah. Rendahnya utilisasi kamar bedah oleh beberapa ahli dikatakan merendahkan citra profesi kedokteran dan para administrator Rumah Sakit.
Instalasi Bedah Sentral RSUP Fatmawati terdiri dari 6 kamar bedah yang seluruhnya melayani tindakan pembedahan elektif. Dari hasil pengamatan, utilisasi kamar bedah perhari / kamar sebesar 174 menit ( 43% dari kapasitas waktu yang tersedia ). Rata-rata kegiatan pembedahan dimulai pukul 08:00 - 09:00, ada nilai ekstrim yang menunjukan kegiatan pembedahan dimulai pukul 07:00 dan pukul 11:00. Beberapa kamar bedah diketahui tidak terpakai.
Penelitian ini bertujuan untuk meningkatkan utilisasi kamar bedah dengan optimalisasi waktu kerja di Instalasi Bedah Sentral RSUP Fatmawati yang didapat dengan metoda simulasi. Model penelitian ini adalah penelitian operasional dengan analisis deskriptif dan pendekatan retrospektif. Populasi pada penelitian ini adalah jumlah kasus bedah elektif di IBS RSUP Fatmawati, sampel penelitian diambil dari data sekunder selama 6 bulan pada 5 Satuan Medik Fungsional dengan jumlah kasus bedah elektif terbesar dan mempunyai catatan perencanaan pembedahan.
Dari hasil penelitian yang dilakukan diketahui rata-rata utilisasi kamar bedah/minggu sebesar 658 menit(36.26%). Waktu kerja IBS yang efektif rata-rata 1507 menit/minggu, hal ini dapat meningkatkan utilisasi rata-rata 30.38 % dari yang dicapai saat ini. Diperkirakan dibutuhkan 76 tempat tidur untuk pasien bedah elektif.
Dari hasil simulasi, waktu kerja IBS yang optimal yaitu: 5 hari kerja (2x405 menit + 3x195 menit) dan 4 hari kerja (3x405 menit + 1x195 menit).Dengan optimalisasi waktu kerja di IBS, diharapkan produktifitas tenaga kerja tinggi dan adanya efisiensi terhadap sumber daya terutama waktu.
Saran yang dikemukakan adalah, dalam menerapkan alternatif optimalisasi waktu kerja, perlu ditunjang dengan perencanaan jadual pembedahan yang sesuai dengan waktu tindakan masing-masing jenis tindakan bedah elektif. Untuk mengetahui optimalisasi jadual perencanaan pasien bedah elektif perlu penelitian lebih lanjut tentang model pelayanan yang sesuai untuk kamar bedah di IBS RSUP Fatmawati.

Recent developments in medical science and technology have led to specialties and expensive treatment in surgical cases. Many expectation of surgery also made contributions. The last decade, there was much pressure in hospital to do cost containment. The idea was to centralize some cost centers, one of them is Operating Room. The idea made some questions about utilization and effectivity of operating room. The low utilization of operating room was humiliating the image of medical professions including hospital administrator.
Central surgery installation in Fatmawati General Hospital consist 6 operating room which service the elective surgery. The utilizations of its operating room 174 minutes per room per day (43 % from optimal capacity ). Usually surgery starts among 08:00 - 09:00 a.m. Sometimes at 07:00 or 11:00 a.m. And some operating room were not used.
The object of this research is to optimalize the utilization of operating room in central surgery installation with working time minimalization using simulation method. This research was operation research with descriptive analysis and retrospective perspective. The population are total cases of elective surgery in central surgery instalation at Fatmawati general hospital, the samples were taken from 5 medical function units that have the more cases and surgical planning in 6 months.
The result average utilization of operating room is 658 minutes per week (36.26 %) . The effective time is 1507 minutes per week. This, could increase average utilization as many as 30.28 %.The needed of total beds for elective patients are 76 beds.
The result of simulation, optimal working time are 5 days (2x405 minutes + 3x195 minutes ) and 4 work days ( 3x405 minutes + 1x195 minutes ). The optimalization of working time could improve the productivity and effectivity, mainly time.
For implementing this alternative optimalization, the schedule of surgery has to be prepared effectively depends of type of surgery. Needed further research to optimalize scheduling time, in central surgery installation Fatmawati general hospital.

 File Digital: 1

Shelf
 T8853-Tati Suryati.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Jakarta: Program Pascasarjana Universitas Indonesia, 1997
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resources
Deskripsi Fisik : xi, 98 page : illustration ; 29 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-18-243648240 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 78960