Abstrak
Peran batubara dalam pembangkit listrik semakin penting mengingat sumberdaya energi primer lainnya semakin langka. Karakteristik PLTU berbahan bakar batubara (PLTU-B) menyebabkan jenis pembangkit ini sesuai untuk mendukung beban dasar. Sebagian besar PLTU-B yang beroperasi saat ini berlokasi di Jawa. Adapun sumberdaya batubara yang menjadi bahan bakarnya terdapat di Sumatera dan Kalimantan. Dalam upaya meminimalkan biaya pengadaan batubara untuk PLTU-B tersebut, maka dibuatlah model program linear yang dapat digunakan untuk menentukan sumber pasokan batubara bagi PLTU-B tersebut. Dalam penelitian ini dipilih lima PLTU-B yang terdapat di Jawa dan delapan perusahaan tambang batubara yang berlokasi di Sumatera dan Kalimantan sebagai sumber pasokan batubara bagi kelima PLTU-B tersebut.
The role of coal in power generation becomes more important since the primary energy source became scarce. The characteristic of coal combustion makes this type of power generation suitable to support base load of electricity. Most of the existing coal fired power plant is located in Java. Meanwhile the coal as it fuels came form Sumatra and Kalimantan. In order to minimizing the cost in providing coal for that power plant, the model of linear program is setting. In this research there are five PLTU-B in Java has been selected and eight coal mining company in Sumatra and Kalimantan as supply source for those power plant.
The role of coal in power generation becomes more important since the primary energy source became scarce. The characteristic of coal combustion makes this type of power generation suitable to support base load of electricity. Most of the existing coal fired power plant is located in Java. Meanwhile the coal as it fuels came form Sumatra and Kalimantan. In order to minimizing the cost in providing coal for that power plant, the model of linear program is setting. In this research there are five PLTU-B in Java has been selected and eight coal mining company in Sumatra and Kalimantan as supply source for those power plant.