:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisa masalah hambatan dalam pencapaian kompetensi kerja tenaga terampil pada proyek konstruksi jalan

Noor Dhulam; Ismeth Abidin, supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Laporan penelitian ini menyoroti masalah kerusakan jalan yang sering terjadi di Indonesia. Meskipun kerusakan jalan dapat disebabkan oleh banyak faktor, namun yang menjadi fokus penelitian adalah rendahnya kualitas jalan yang di akibatkan oleh rendahnya kualitas tenaga kerja, kualitas tenaga kerja tersebut meliputi : pengetahuan, keterampilan, dan sikap kerja yang dimiliki oleh tenaga kerja. Jabatan kerja yang menjadi fokus penelitian adalah empat jabatan tenaga terampil, yaitu Asphalt Mixing Plant Operator, Asphalt Sprayer Operator, Road Asphalt Worker dan Asphalt Paver Operator.
Melihat kondisi tersebut, saat ini pemerintah sedang berupaya membuat bakuan kompetensi kerja untuk berbagai bidang kerja. Hal ini dimaksudkan untuk meningkatkan kompetensi tenaga kerja berdasarkan bidang kerjanya, sehingga dengan adanya bakuan kompetensi kerja tersebut, maka secara bertahap kompetensi tenaga terampil pada bidang jasa konstruksi memperoleh pengakuan dari kalangan luas. Penelitian ini diambil dari sudut pandang upaya pencapaian kompetensi oleh tenaga terampil. Pada tahap ini masih terdapat permasalahan yang datang dari faktor eksternal maupun internal, dan berpotensi menghambat pencapaian kompetensi oleh tenaga terampil, Pada akhir penelitian, akhirnya diperoleh tindakan-tindakan korektif yang dapat dilakukan untuk meminimalisasi hambatan tersebut.

This research highlights the problem of road damage, which often happened in Indonesia. Though, damage of road can caused of many factor, but this research is focus only to see low road quality is happened because of low labor quality. And this low quality including: knowledge, skill, and work attitude, which owned by labor, and that things are called competency. Labor work positions, which perceive in this research are four type of road construction skill worker, consist of: Asphalt Mixing Plant Operator, Asphalt Sprayer Operator, Road Asphalt Worker and Asphalt Paver Operator.
See the condition, the government is trying to make standards of competency to various work area. This matter intending to improve labor competency according to it's work area, and phases, the skill worker in road construction project obtaining confession of wide of side. Skilled worker takes this research?s viewpoint from attainment of competency, there are internal and external problems, which is have potential to pursue attainment of skill worker competency. This research results correctional action to minimize these problems.

 File Digital: 1

Shelf
 T 16096-Analisa masalah.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T16096
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xix, 118 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T16096 15-19-471171350 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 85605