Faktor-faktor yang berpengaruh terhadap kinerja kualitas dan waktu dalam proyek pembangunan gedung unit sekolah baru SLTP-MTs = Factors affecting the time and quality performance for construction project of a new SLTP MTs school building

Widiatmojo Suseno; Yusuf Latief, supervisor; Ismeth Abidin, supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Pada mulanya pelaksanaan bantuan untuk pembanguan sekolah diserahkan kepada pihak ketiga untuk melaksanakan pembangunan. Namun ban yak ferjadi penyimpangan-penyimpangan dalam pelaksanaan pekerjaan pembangunan fisik sekolah yang berdampak kualitas pembangunan sangat buruk dan tidak sesuai dengan besamya dana. Keadaan ini memunculkan kebijakan pengaluran dana Iangsung ke sekolah. Pala pelaksanaan pembangunan dengan konsep partisipasi masyarakat ada/ah kondisi dimana pihak sekolah dapat melakukan pelaksanaan pembangunan dengan dukungan masyarakat disekitar lokasi pembangunan sekolah dan tanpa melakukan kontrak pada pihak ketiga.
Penelitian ini bertujuan untuk mengetahui faktor-faktor yang mempengaruhi kinerja kualitas dan waktu dalam proyek pembangunan gedung unit sekolah bare SLTP-MTs.
Panelitian ini dilakukan untuk mengetahui faktor-faktor yang dominan pada pelaksanaan kegiatan yang akan berpengaruh kepada keberhasilan kinerja kualitas dan waktu proyek pembangunan sekolah dengan konsep partisipasi masyarakat. Metode penelitian menggunakan instrumen quisioner. Responden terdiri dari personil pelaksana ditingkat sekolah dan konsultan . Hasil penelitian yang dilakukan telah mengidentifkasi faktor dominan yang memperigraruhi kinerja kualifas dan waktu dalam proyek ini adalah sosialisasi dari transparansi pelaksanaan pekerjaan dengan konsep partisipasi masyarakat, serta didukung dengan perencanaan terhadap waktu pelaksanaan pekerjaan yang sesuai dengan kondisi setempat.

At first the distribution of school construction funds were handed over to contractors to carry out the constracs. Mis-management in implementation produced poor quality of the constructions due to reduction of actual funds. This condition introduced new policies for distributing grant to schools. New contracting concept by community participation construction then permitted schools to carry out the construction without involving contractors.
The aim of this research is to identify factors influence the success of time and quality performance for construction project of a new SLTP-MTs school building.
The research is to understand the dominant factors in the construction process which influences the success of time and quality performance conducted by concept community participation. The methodology of research used was questionnaires. The respondents were personel of Team that build the School and Consultant.
The research concluded that main factors which influence the success of time and quality performance for this construction project is socialization an transparencies of this work with concept community participation, and it is support by planning of time schedule.

 File Digital: 1

Shelf
 T 16859a.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T16859
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : x, 49 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T16859 15-17-920590685 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 89469