:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Rancangan pengukuran dan penentuan indikator kinerja perguruan tinggi swasta dengan balanced scorecard (studi kasus : Universitas Darma Persada, Jakarta)

Purba, Jamaluddin; Sommeng, Andy Noorsaman, supervisor (Fakultas Teknik Universitas Indonesia, 2001)

 Abstrak

Perguruan tinggi swasta saat ini tengah memasuki pasar kompetitif. Untuk itu pertu penataan sasaran dan kebijakan agar proses belajar mengajar dalam menghasilkan lutusan, proses pemasaran Iulusannya, proses manajemen serta birokrasi dapat terkendali melalui pengukuran kinerja.
Dalam mencapai tujuan dan menjadikannya PTS yang diminati, dan memiliki daya saing pada masa akan datang maka penerapan pengukuran kinerja dengan Balanced Scorecard sebagai alat untuk menilai keberhasilannya dapat digunakan. Karena pengukuran kinerja dalam jangka paniang tidak cukup ditinjau dari perspektif Keuangan
(Financial Perspective). Dengan Balanced Scorecard melengkapi pengukuran tersebut dengan Customer Perspective, Process internal Business, serta Leaming and Growth.
Aplikasi pengukuran ini dilakukan dengan menterjemahkan visi, misi dan strategi metalui perencanaan tujuan, target dan ukuran-ukuran serta inisiatif strategis. Dari hasil pengukuran dengan menggunakan kriteria penilaian, skala yang ditetapkan Serta bobot yang dirancang diketahui katagori masing-masing perspektif apakah katagori baik, sedang dan jelek/rendah untuk selanjutnya dilakukan penelusuran terhadap terhadap
penyebab dan akibat.
Dari measures yang ditetapkan diaplikasikan menjadi indikator yang memungkinkan (list ofposibie indicator) digunakan sebagai indikator yang akan dipilih melalui matriks prioritas. Seianjutnya dari seluruh objectives diuraikan pada unit-unit departemen Balanced Scorecard, yaitu dalam unit departemen Maintanance, Marketing dan Production, merupakan objectives yang dipilih menjadi Strategic Objectives pada matriks prioritas. Melalui penyusunan Balanced Scorecard PTS UNSADA dengan
menggunakan Matrik Prioritas dapat diketahui strategic objectives dan indikator terpilih kemudian ditentukan indikator proses (lag indikator) sebagai pemacu dalam mengontrot pencapaian target yang akan dicapai dart strategic objectives.
Perencanaan Strategi (Strategy Planning) yang akan dilakukan supaya terarah pada target yang diharapkan dalam mencapai tujuan dalam visi

Private University is entering competitive market today. Therefore, it should arrange its policy and target in order to the process of teaching and learning could yield graduates, marketing process, as well as management and bureaucracy that are controlled through work measurement. In reaching its aim to be wanted-private university and to have highly competitive among other private universities in the future, it should implement work gauging with Balanced scorecard as a tool to grade the achievement that could be used. Because the work measuring in long term is not enough if it is viewed from Financial perspective. The Balanced Scorecard completed the measurement with Customer Perspective, Process lnternal Business Perspective, and Learning and Growth Perspective.
The implementation of this gauging was carried out with depicting vision, mission and strategy through planing determination of aim, target, and indicators as well as strategic initiative. From the results of measurement with grading criteria, and implemented scale as well as planned quality, each prospective category is comprehended whether
it is good, mediocre and bad. And further investigation of it's reason and out put could be carried out.
The decided measurers were indicators that enable list of possible indicator could be utilized as would-be-chosen indicator through matrix of priority. And then from the whole objectives is distributed into Balanced Scorecard department units, that are in maintenance department unit, marketing and production that are also as strategic
objective at the matrix of priority.
Through Balanced Scorecard with Matrix Priority, the strategic Objectives and selected indicators of the university could be perceived and it's used, as trigger to control the achievement of the University targets.
ln order to the strategy planning, which would be carried out, is aimed to the expected target in achieving vision, mission and the Master Development Plan. It needs to determine time frame on the achievement level. The Dimension of Implementation time could be detailed in long-term, medium term, and short term. It needs strategy initiative to succeed the achievement of each aim and the would-be-reached the target, and they could be renewed if the target change is carried out.

 File Digital: 1

Shelf
 T5920-Jamaluddin Purba.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T5920
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2001
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xiii, 188 pages: illustration; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T5920 15-19-726213509 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 96788