Rekomendasi tindakan koreksi pada pengendalian biaya overhead dengan metode hybrid probabilistic neural networks

Eka Dharma Putra; Ismeth Abidin, supervisor; Yusuf Latief, supervisor (Fakultas Teknik Universitas Indonesia, 2004)

 Abstrak

Dalam suatu proyek konstruksi pengendalian biaya merupakan hal yang fundamental untuk mencapai sasaran sesuai dengan yang direncanakan. Untuk mencapai hasil yang maksimal perlu diupayakan suatu sistem pengendalian biaya yang baik sehingga berbagai penyimpangan yang dapat menyebabkan terjadinya cost over run bisa dihindari. Salah satu komponen biaya yang perlu dikendalikan adalah biaya overhead. Sehingga perhitungan yang tepat dalam menentukan besarnya biaya overhead lapangan akan mempengaruhi kinerja biaya proyek. Karakteristik dunia konstruksi yang unik dan penuh ketidakpastian membutuhkan suatu sistem pengendali yang tepat dan akurat. Berbagai software-software project management yang dikembangkan sekarang belum maksimal untuk memberikan solusi yang dapat mengantisipasi terjadinya penyimpangan dalam pelaksanaan konstruksi. Salah satu sistem komputer yang dikembangkan untuk mengatasi hal ini adalah suatu program komputer berbasis sistem jaringan syaraf probabilistik (probabilistic neural network). Program komputer ini nantinya akan memberikan dukungan dalam pengambilan keputusan untuk melakukan tindakan koreksi yang paling tepat berdasarkan pertimbangan risiko yang rnungkin terjadi terhadap berbagai penyimpangan yang terdapat dalam pengelolaan biaya overhead di lapangan.

In construction project, financial control represent the fundamental matter to reach target matching with planned. Maximal result requires to be strived by a good financial control system so that various deviation which can cause cost overrun can be avoided. One of component of costs which require to be controlled is overhead cost. So that the correct calculation in determining the level of overhead field cost will influence project costs performance. Highly uncertain and unique characteristic in construction require an accurate and correct controller system. Various project management software developed do not give maximal solution which can anticipate the happening of deviation in construction execution yet. One of computer system developed to overcome this matter is a computer program base on probabilistik neural nettii'orks system. This computer program later will give support in decision making to conduct action most precise correction pursuant to consideration of risks which is possible happened to various deviation in overhead cost management.

 File Digital: 1

Shelf
 T 15003-Rekomendasi tindakan-TOC.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T15003
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2004
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : x, 122 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T15003 15-19-662684156 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 99249