:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Proses Perencanaan dan Pengendalian Pada Proses Desain di PT RE Berdasarkan PMBOK 6th Edition Berbasis Risiko untuk Meningkatkan Kinerja Kualitas = The Development of Planning and Controlling in Design Process at PT RE Based on PMBOK 6th Edition Based on Risk to Improve Quality Performance

Lisa Azizah; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner; Ayu Herzanita Yufrizal, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Desain memiliki arti proses yang bertujuan untuk membuat dan menciptakan objek baru. Kesalahan pada tahap desain dapat menyebabkan kegagalan konstruksi proyek. PT RE adalah perusahaan yang bergerak di bidang Engineering Services untuk proyek-proyek EPC. Proyek-proyek yang dikerjakan oleh PT RE kerap mengalami kesalahan desain. Penelitian ini dilakukan untuk memberikan pengembangan prosedur perencanaan dan pengendalian untuk meningkatkan kinerja kualitas dengan menggunakan analisa risiko dari PMBOK 6th edition. Hasil penelitian diketahui bahwa proses perencanaan dalam tahap desain memiliki enam risiko signifikan yang berasal dari empat knowledge area, yaitu Manajemen Lingkup Proyek, Manajemen Waktu Proyek, Manajemen Biaya Proyek dan Manajemen Komunikasi Proyek. Sedangkan proses pengendalian memiliki empat risiko signifikan yang berasal dari empat knowledge area, yaitu Manajemen Lingkup Proyek, Manajemen Waktu Proyek, Manajemen Biaya Proyek, dan Manajemen Pengadaan Proyek.

Design means the process that aims to create and create new objects. Errors at the design stage can lead to project construction failure. PT RE is a company engaged in Engineering Services for EPC projects. The projects undertaken by PT RE often suffer from design errors. This research is conducted to provide the development of planning and controlling procedures to improve quality performance using risk analysis matrix from PMBOK 6th edition. The study's findings indicate that there are six significant risks in the planning process throughout the design stage, which come from four knowledge areas: project scope management, project time management, project cost management, and project communication management. The control process contains four significant risks that originate from four knowledge areas: Project Scope Management, Project Time Management, Project Cost Management, and Project Procurement Management.

 File Digital: 1

Shelf
 T-Lisa Azizah.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Jakarta : Fakultas Teknik Universitas Indonesia, 2022
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvii, 168 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-16457561 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920516280