Full Description

Record of Work Profesi
Cataloguing Source LibUI ind rda
Content Type text (rdacontent)
Media Type unmediated (rdacontent); computer (rdacontent)
Carrier Type volume (rdacarrier); online resource (rdacarrier)
Physical Description xiii, 34 pages : illustrations ; 28 cm. + appendix
Concise Text
Holding Institution Universitas Indonesia
Location Perpustakaan UI
 
  •  Availability
  •  Digital Files: 1
  •  Review
  •  Cover
  •  Abstract
Call Number Barcode Number Availability
PR-pdf 16-23-06128647 TERSEDIA
No review available for this collection: 9999920516470
 Abstract
Laporan Praktik Keinsinyuran ini membahas review atau tinjauan terhadap studi kelayakan pengembangan sistem penyediaan air minum (SPAM) di zona 2 Kota Tangerang. Pembahasan difokuskan pada aspek teknis, investasi, dan sosial dan lingkungan. Metodologi yang digunakan berbasis pada pendekatan critical review analysis yang terdiri atas studi literatur, diskusi/brainstorming, survei, dan analisis. Review studi kelayakan dimaksudkan untuk memperoleh acuan yang dapat digunakan untuk menilai kelayakan teknis dan non-teknis terhadap lelang pekerjaan pengembangan SPAM di zona 2 Kota Tangerang yang dilakukan oleh Perumda Tirta Benteng. Hasil review menunjukkan bahwa perlu dilakukan pemutakhiran data aspek teknis dan aspek sosial dan lingkungan dengan menggunakan data terkini agar menghasilkan analisis dan rekomendasi studi kelayakan yang lebih tepat. ......This report discusses a review of the feasibility study for the development of a drinking water supply system (SPAM) in zone 2 of the Tangerang city. The discussion focused on technical, investment, and social and environmental aspects. The methodology used is based on a critical review analysis approach consisting of literature studies, discussion/brainstorming, surveys, and analysis. The review of the feasibility study is intended to obtain a reference that can be used to assess the technical and non-technical feasibility of the tender for the SPAM development work in zone 2 of the Tangerang city which is being carried out by Perumda Tirta Benteng. The results of the review indicate that it is necessary to update data on technical aspects and social and environmental aspects using the latest data in order to produce more appropriate analyzes and recommendations for feasibility studies.