:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Evaluasi Proyek Reparasi Kapal Berdasarkan Project Performance Index Dengan Metode Earned Value Analysis = Ship Repair Project Evaluation Based on the Project Performance Index Using the Earned Value Analysis Method

Naufal Aziz Putra; Achmad Riadi, supervisor; Sunaryo, examiner; Muhammad Arif Budiyanto, examiner; Gerry Liston Putra, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Suatu proyek dalam pengerjaan tentu terdapat keterlambatan pekerjaan biasa dikarenakan adanya faktor manusia dan juga faktor alam yang tentunya sangat diperlukan tindakan pengendalian dari segi biaya dan waktu. Akan tetapi sebelum dilakukan tindakan pengendalian biaya dan waktu, perlu diperhatikan terlebih dahulu kinerja suatu proyek yang telah berlangsung. Salah satu cara untuk mengetahui kinerja proyek adalah metode earned value analysis. Metode earned value analysis memadukan unsur jadwal dan biaya. Analisa earned value ini akan diterapkan pada proyek reparasi kapal BG MKR. Kinerja proyek didapatkan berdasarkan perhitungan cost performance index dan schedule performance index. Perhitungan didasarkan pada planned value, earned value dan actual cost. Pengontrolan kinerja ditinjau pada 1 Februari 2022, 4 Februari 2022 dan 7 Februari 2022. Hasil analisa pada 7 Februari 2022 menunjukkan bahwa biaya yang dikeluarkan lebih rendah dari biaya yang dianggarkan tetapi waktu pelaksanaan lebih lama dari jadwal yang direncanakan. Hal ini ditunjukkan dengan nilai CPI = 1.05 (CPI > 1) dan SPI = 0.97 (SPI<1). Kebutuhan man power dalam pengerjaan hull cleaning juga didapat bahwa dibutuhkan kurang lebih 16 man power. Pengerjaan bisa dilakukan lebih cepat dengan menambah man power

A project in progress, of course there is a delay in ordinary work due to human factors and also natural factors which are of course very control measures are needed in terms of cost and time. But before cost and time control measures need to be considered first performance of an ongoing project. One way to know the performance project is the earned value analysis method. The earned value analysis method combines schedule and cost elements. This earned value analysis will be applied to the repair project the BG MKR ship. Project performance is obtained based on cost performance calculations index and schedule performance index. Calculation is based on planned value, earned value and actual cost. Performance controls reviewed on February 1, 2022, 4 February 2022 and February 7, 2022. The results of the analysis on February 7, 2022 show that the costs incurred are lower than the budgeted costs but time implementation later than the planned schedule. This is indicated by the value CPI = 1.05 (CPI > 1) and SPI = 0.97 (SPI<1). The need for man power in the process hull cleaning also found that it takes approximately 16 man power. Processing can be done faster by adding man power.

 File Digital: 1

Shelf
 S-Naufal Aziz Putra.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2022
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 68 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-pdf 14-23-73621601 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920517435