Pengembangan Manajemen Portofolio Proyek Maturity Model pada Perusahaan Jasa Konstruksi BUMN = Development of Project Portfolio Management Maturity Model at Indonesia Construction State-Owned Enterprise
Youhan Pratama Febrianto;
Rahayu Setyawati, supervisor; Yusuf Latief, examiner; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner
(Fakultas Teknik Universitas Indonesia, 2023)
|
Manajemen Portofolio Proyek (Project Portfolio Management/PPM) terbukti mampu meningkatkan keunggulan melalui mekanisme yang secara dinamis mendukung organisasi untuk mengatur basis sumber daya mereka untuk menghadapi perubahan lingkungan. PPM Maturity Model adalah alat untuk menilai tingkat kemampuan dalam proses, alat, dan orang-orang yang terlibat dalam mengelola proses portofolio proyek. Mengelola kematangan portofolio adalah proses penting untuk memastikan bahwa organisasi mengembangkan proses yang tepat berdasarkan kebutuhan organisasi. Penelitian ini akan membuat PPM Maturity Model dan menentukan PPM Maturity Level untuk perusahaan Jasa Konstruksi BUMN. Diawali dengan menganalisis parameter PPM apa saja yang berpengaruh pada PPM Maturity Model, lalu memetakan PPM maturity level dan terakhir menentukan parameter yang paling berpengaruh dalam PPM Maturity Level pada Perusahaan Jasa Konstruksi BUMN di Indonesia. Hasil dari penelitian ini adalah ditemukan 5 variabel dan 40 indikator pada PPM Maturity Model yang dapat untuk mengukur PPM Maturity Level. Indikator paling berpengaruh adalah kemampuan beradaptasi dan ketahanan perusahaan. Project Portfolio Management (PPM) is proven to be able to increase excellence through mechanisms that dynamically support organizations to manage their resource base to deal with environmental changes. The PPM Maturity Model is a tool for assessing the level of proficiency in the processes, tools, and people involved in managing the project portfolio process. Managing portfolio maturity is an important process to ensure that the organization develops the right processes based on the needs of the organization. This research will create a PPM Maturity Model and determine the PPM Maturity Level for BUMN Construction Services companies. It begins with analyzing which PPM parameters affect the PPM Maturity Model, then maps the PPM maturity level and finally determines the most influential parameters in the PPM Maturity Level in BUMN Construction Service Companies in Indonesia. The results of this study were found to be 5 variables and 40 indicators in the PPM Maturity Model which can be used to measure the PPM Maturity Level. The most influential indicators are the company's adaptability and resilience. |
T-Youhan Pratama Febrianto.pdf :: Unduh
|
No. Panggil : | T-pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Jakarta: Fakultas Teknik Universitas Indonesia, 2023 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xv, 175 pages : illustration + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-pdf | 15-23-95535138 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 9999920517462 |