:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Evaluasi Penerapan Manajemen Risiko Terintegrasi pada PT Klien P = Evaluation of Enterprise-Wide Risk Management Implementation of PT Klien P

Nafisa Arzalia Angie; Prodjo Sunarjanto, supervisor; Elvia Rosantina Shauki, examiner; Widya Perwitasari, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023)

 Abstrak

Laporan magang ini menyajikan evaluasi atas Penerapan Manajemen Risiko Terintegrasi pada PT Klien P menggunakan sembilan prinsip Risk Intelligence Framework sebagai kerangka evaluasi utama, serta kepatuhan penerapannya terhadap Peraturan Kementerian BUMN Nomor PER-5/MBU/09/2022. Kerangka evaluasi utama yang digunakan akan dievaluasi menggunakan standar yang relevan seperti ISO 31000:2018, COSO ERM 2017, serta Peraturan Kementerian Badan Usaha Milik Negara (BUMN) Nomor PER-5/MBU/09/2022. Berdasarkan hasil evaluasi, kerangka utama yang digunakan dinilai layak untuk mengevaluasi penerapan Manajemen Risiko untuk seluruh BUMN. Di sisi lain, hasil evaluasi terhadap implementasi Manajemen Risiko Terintegrasi PT Klien P sudah mematuhi Peraturan KBUMN, namun belum berada pada tingkat yang mahir jika dievaluasi dengan 9
prinsip pada Risk Intelligence Framework. Oleh karena itu, perlu dilakukan perbaikan implementasi berdasarkan kerangka evaluasi terkait. Laporan ini diakhiri dengan rekomendasi terhadap implementasi PT Klien P dan prosedur yang dilakukan PT Konsultan A, serta refleksi mengenai pengalaman magang secara keseluruhan oleh penulis, termasuk perkembangan profesional dan personal yang dialami.

This internship report presents an evaluation of PT Client P's Enterprise-Wide Risk Management Implementation using the nine principles of the Risk Intelligence Framework as the main evaluation framework and its compliance with the Ministry of SOE Regulation Number PER-5/MBU/09/2022. The main evaluation framework will also be evaluated using relevant standards such as ISO 31000:2018, COSO ERM 2017, as well as Ministry of State-Owned Enterprises Regulation Number PER-5/MBU/ 09/2022. Based on the evaluation, the main framework used is considered appropriate for evaluating the Risk Management implementation for all SOEs. On the other hand, the results of the evaluation of the implementation of Enterprise-Wide Risk Management at PT Client P have complied with the SOE Ministry Regulations, but not at a mature level yet when evaluated with the 9 principles of the Risk Intelligence Framework. Therefore, it is necessary to improve implementation based on the related evaluation framework. This report ends with recommendations on the implementation of PT Client P and the procedures carried out by PT Konsultan A, as well as reflections on the author's overall internship experience, including the professional and personal development experienced.

 File Digital: 1

Shelf
 TA-Nafisa Arzalia Angie.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xi, 80 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-23-54314616 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920523678