:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Manajemen Proyek Pembangunan Jembatan Timbang Dinamis Kendaraan Bermotor Weigh In Motion (WIM) Dengan Metode Critical Path Method = Dynamic Weighbridge Construction Project Management Weigh In Motion (WIM) Motorized Vehicles With Critical Methods Path Method

Aditya Gumelar Ekaputra; Andri Dwi Setiawan, supervisor; Romadhani Ardi, examiner; Muhammad Haikal Satria, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Critical Path Method (CPM) adalah metode manajemen proyek yang digunakan untuk mengidentifikasi jalur kritis dalam suatu proyek. Jalur kritis adalah serangkaian tugas yang memiliki dampak langsung pada waktu penyelesaian keseluruhan proyek. CPM membantu manajer proyek dalam merencanakan, mengendalikan, dan mengawasi proyek dengan mengidentifikasi tugas-tugas yang paling kritis dan memperkirakan waktu penyelesaiannya. Metode ini melibatkan pembuatan diagram jaringan yang menggambarkan urutan tugas dan ketergantungan antartugas dalam proyek. Setiap tugas diberi estimasi waktu penyelesaian yang meliputi waktu paling awal dan paling lambat. Dengan menggunakan teknik perhitungan, CPM dapat menentukan jalur kritis, yaitu serangkaian tugas yang memiliki waktu penyelesaian terpanjang dan tidak boleh mengalami keterlambatan tanpa mempengaruhi waktu penyelesaian proyek. Dengan mengetahui jalur kritis, manajer proyek dapat fokus pada tugas-tugas yang paling penting dan mengatur prioritasnya. Mereka juga dapat mengidentifikasi tugas-tugas yang dapat dipercepat dengan mengalokasikan sumber daya tambahan atau mengubah urutan tugas. Hal ini memungkinkan manajer proyek untuk mengoptimalkan waktu penyelesaian proyek dan menghindari keterlambatan yang tidak diinginkan. Dalam kesimpulannya, Critical Path Method adalah metode yang efektif untuk merencanakan dan mengendalikan proyek. Dengan mengidentifikasi jalur kritis, manajer proyek dapat mengambil tindakan yang diperlukan untuk memastikan penyelesaian proyek tepat waktu. CPM memberikan pemahaman yang lebih baik tentang waktu penyelesaian proyek secara keseluruhan, memungkinkan manajer untuk membuat keputusan yang efisien dan efektif dalam mengelola proyek

The Critical Path Method (CPM) is a project management method used to identify the critical path in a project. The critical path is a series of tasks that have a direct impact on the completion time of the entire project. CPM assists project managers in planning, controlling and monitoring projects by identifying the most critical tasks and estimating their completion time. This method involves creating a network diagram that depicts the sequence of tasks and dependencies between tasks in a project. Each task is given an estimated completion time which includes the earliest and the latest time. By using calculation techniques, CPM can determine the critical path, namely the series of tasks that have the longest completion time and must not experience delays without affecting the project completion time. By knowing the critical path, the project manager can focus on the most important tasks and set their priorities. They can also identify tasks that can be expedited by allocating additional resources or changing the order of tasks. This allows project managers to optimize project turnaround times and avoid unwanted delays. In conclusion, the Critical Path Method is an effective method for planning and controlling projects. By identifying the critical path, the project manager can take the necessary actions to ensure the timely completion of the project. CPM provides a better understanding of the overall project turnaround time, enabling managers to make efficient and effective decisions in managing projects

 File Digital: 1

Shelf
 PR-Aditya Gumelar Ekaputra.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 56 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-24-35838978 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920524333