:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Rekayasa Pemasangan Jembatan Timbang untuk Pengendalian Pengisian Semen Curah dalam Memenuhi Regulasi Zero O.D.O.L pada Pabrik Semen di Citeureup, Jawa Barat = Weighbridge Installation Engineering for Controlling Bulk Cement Filling in Compliance with Zero O.D.O.L Regulations at Cement Industry in Citeureup, West Java

Difi Nuary Nugroho; Arief Udhiarto, supervisor; Muhammad Salman, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Implementasi Kebijakan Zero Over Dimension Overload (O.D.O.L) ini terhadap pabrik semen di Citeureup ini akan berdampak kepada lamanya waktu pelayanan yang akan meningkat seiring dengan meningkatnya jumlah truk yang masuk kedalam Pabrik Semen. Kondisi pengisian semen curah pada pabrik Citeureup ini sebelum penerapan regulasi Zero ODOL, terdiri dari 3 jenis truk yaitu jenis tronton dengan kapasitas 20 dan 35-ton dan truk trailer dengan kapasitas 60 ton, namun setelah penerapan regulasi menjadi seperti data grafik diatas. Hal ini menyebabkan jumlah truk menjadi 2,5 kali lipat. Laporan praktik keinsinyuran ini menganalisis dengan pendekatan aspek teknis, profesionalisme, kode etik dan K3L dalam rekayasa pemasangan jembatan timbang untuk pengendalian dalam pengisian semen curah dalam pemenuhan regulasi Zero Over Dimension Overload pada pabrik semen di Citeureup, Jawa Barat.

The implementation of the Zero Over Dimension Overload (O.D.O.L) Policy for the cement factory in Citeureup will have an impact on the length of service time which will increase in line with the increasing number of trucks entering the Cement Factory. The conditions for filling bulk cement at the Citeureup factory before the implementation of the Zero ODOL regulation consisted of 3 types of trucks, namely 20 and 35-ton tronton trucks and 60-ton capacity trailer trucks, but after the implementation of the regulations it became like the graphic data above. This causes the number of trucks to be 2.5 times. This engineering practice report analyzes the approach to technical aspects, professionalism, code of ethics and K3L in engineering the installation of weigh bridges for control in bulk cement filling in compliance with Zero Over Dimension Overload regulations at cement factories in Citeureup, West Java.

 File Digital: 1

Shelf
 PR-Difi Nuary Nugroho.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : 52 pages : illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-23-59303410 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920526319