:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis Risiko dan Rekomendasi untuk Meningkatkan Kinerja Biaya Logistik Proyek Epc di Lokasi Remote = Risk analysis and Recommendations to Improve the Logistics Cost Performance of the EPC Project in the Remote Area

Ferdi Firdausy; Wisnu Isvara, supervisor; Fadhilah Muslim, examiner; Rossy Armyn Machfudiyanto, examiner; Ayu Herzanita Yufrizal, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Proyek EPC dan konstruksi umumnya memiliki tingkat kerumitan, dan ketidakpastian yang tinggi. Perubahan yang terjadi pada tahap engineering, konstruksi, sistem kontrol, dan sub-logistik akan berdampak pada kinerja biaya logistik dan pada akhirnya mempengaruhi margin proyek, lemahnya kontrol proyek, dan memiliki potensi risiko tinggi. Tujuan dari penelitian ini adalah untuk mengetahui variabel risiko yang mempengaruhi kinerja biaya logistik, memperoleh identifikasi risiko tinggi dari variabel engineering, construction, dan system control yang mempengaruhi kinerja biaya logistik serta menentukan tanggapan dan rekomendasi risiko kepada meningkatkan kinerja biaya logistik pada proyek EPC di lokasi terpencil. Data dikumpulkan dari studi literatur, wawancara dengan responden, dan pakar. Dari 51 jawaban responden, risiko yang teridentifikasi adalah 30 faktor yang ditinjau dari probabilitas dan dampaknya. Metodenya melalui analisis deskriptif, uji validitas & reliabilitas, dan analisis risiko kualitatif. Selanjutnya, tindak lanjut hasil risiko akan dilakukan melalui mitigasi proaktif dan reaktif. Penelitian ini menemukan 7% variabel ekstrim, dan 93% adalah kategori berisiko tinggi. Dengan demikian bahwa semua variabel mempengaruhi kinerja biaya logistik dimana lokasi proyek yang jauh merupakan salah satu faktor utama kinerja biaya logistik.

The EPC and construction projects generally have a high level of complexity, and uncertainty. The changes that have occurred in the engineering, construction, control systems, and sub-logistics stages will impact logistics cost performance and finally affect the project margins, weak of project control, and high risk. The purpose of this study is to determine the variable risk that affects the performance of logistics costs, to obtain high-risk identification of engineering, construction, and system control variables that affect the performance of logistics costs and to determine the risk responses and recommendations to improve logistics cost performance on EPC projects in remote locations. Data was collected from literature studies, interviews with respondents, and experts. By 51 respondents' answers, the risk was identified are 30 factors in terms of the probabilities and impact. The method through descriptive analysis, validity & reliability testing, and qualitative risk analysis. Further, the follow-up of risk results would carry out through proactive and reactive mitigation. This research found 7% of the variables were extreme, and 93% were high-risk categories. Thus it indicates that all variables affect the logistics costs performance where the remote project locations are one of the main factors in increasing the logistics costs.

 File Digital: 1

Shelf
 T-Ferdi Firdausy.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : 155 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-74431406 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920526320