:: Artikel Jurnal :: Kembali

Artikel Jurnal :: Kembali

The batch scheduling model for dynamic multi-item, multi-level production in an assembly job shop with parallel machines

Amar Rachman, Purdianta , Arian Dhini (Faculty of Engineering, Universitas Indonesia, 2015)

 Abstrak

Most classical scheduling approaches deal with single products, single machines, and static manufacturing environments. In real-world manufacturing systems, however, scheduling can be assigned for multi-item production on multimachines in a dynamic environment in which unexpected new orders may be received. This paper focuses on scheduling problems in an assembly job shop with parallel machines that produce multi-item multi-level products. Models were developed for due date fulfillment and due date assignment in static and dynamic conditions, with the objectives of minimizing total actual flow time, while considering the defect rate at each stage of the process. The insertion technique was used in the scheduling process; insertion can be performed in batch operations at all available positions on all machines. A hypothetical case of job shop scheduling problems associated with multi-item, multi-level production on parallel machines was studied, and the computational results demonstrated the validity of the proposed algorithms.

 Metadata

No. Panggil : UI-IJTECH 6:1 (2015)
Entri utama-Nama orang :
Subjek :
Penerbitan : Depok: Faculty of Engineering, Universitas Indonesia, 2015
Sumber Pengatalogan : LibUI eng rda
ISSN : 20869614
Majalah/Jurnal : International Journal of Technology
Volume : Vol. 6, No. 1, January 2015: Hal. 84-96
Tipe Konten : text
Tipe Media : unmediated
Tipe Carrier : volume
Akses Elektronik : https://doi.org/10.14716/ijtech.v6i1.783
Institusi Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 4 R. Koleksi Jurnal
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
UI-IJTECH 6:1 (2015) 08-23-54126135 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920530472