Analisis Risiko dalam Proses Pengadaan Barang dan Jasa untuk Overhaul Pembangkit Listrik Tenaga Uap = Risk Analysis in the Procurement Process of Goods and Services for Steam Power Plant Overhaul
Rangga Damar Bagaskara;
Novandra Rhezza Pratama, supervisor; Djoko Sihono Gabriel, examiner; Farizal, examiner
(Fakultas Teknik Universitas Indonesia, 2023)
|
Kegiatan overhaul pembangkit listrik bertujuan untuk menjaga keandalan pembangkit listrik sehingga dapat beroperasi secara maksimal dan dapat meminimalkan jumlah terjadinya force outage. Seluruh pihak yang terlibat dalam kegiatan overhaul ini harus mampu bekerja secara dinamis sesuai kondisi yang ada untuk mendukung tercapainya kinerja overhaul yang on time, on cost, on quality, on scope, on clean, dan on safety (6 ON). Oleh karena itu, dibutuhkan sebuah analisis dan mitigasi risiko dalam proses pengadaan barang dan jasa untuk overhaul pembangkit listrik sehingga dapat membantu perusahaan dalam mengambil keputusan. Metode Analytic Network Process (ANP) untuk mendapatkan bobot penyebab risiko (risk agent) yang berpengaruh terhadap terjadinya suatu risiko (risk event). Metode House of Risk (HOR) untuk melakukan identifikasi, analisis dan mitigasi risiko. Hasil penelitian menunjukkan terdapat 12 tipe risiko dengan 18 risiko yang disebabkan oleh 20 penyebab risiko. Berdasarkan perhitungan nilai Aggregate Risk Potential (ARP), didapatkan 2 tindakan mitigasi risiko yang dapat dilakukan. Penerapan 2 tindakan mitigasi risiko ini diharapkan dapat meminimalisasi peluang terjadinya dan dampak dari penyebab risiko. Power plant overhaul activities aim to maintain the reliability of the power plant so that it can operate optimally and can minimize the number of force outages. All parties involved in this overhaul activity must be able to work dynamically according to existing conditions to support the achievement of overhaul performance that is on time, on cost, on quality, on scope, on clean, and on safety (6 ON). Therefore, a risk analysis and mitigation is needed in the process of procuring goods and services for power plant overhaul so that it can help companies make decisions. The Analytic Network Process (ANP) method to obtain the weight of risk agents that affect the occurrence of a risk (risk event). House of Risk (HOR) method for risk identification, analysis and mitigation. The results showed there were 12 types of risk with 18 risks caused by 20 risk causes. Based on the calculation of the Aggregate Risk Potential (ARP) value, 2 risk mitigation actions can be taken. The implementation of these 2 risk mitigation actions is expected to minimize the chance of occurrence and impact of the risk causes. |
T-Rangga Damar Bagaskara.pdf :: Unduh
|
No. Panggil : | T-pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2023 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xv, 110 pages : illustration + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-pdf | 15-24-55316628 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 9999920537759 |