Rusydi Yazid, author
Analisa risiko peningkatan biaya (Cost Overrun) pembangunan Terowongan Sudetan Kali Ciliwung ke Kanal Banjir Timur (KBT) = Cost overrun risk analysis of Ciliwung river to East Flood Canal shortcut tunnel construction
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Indra Tua, author
Pengaruh penerapan plan of development (POD) basis terhadap unrecovered cost dari perspektif kontraktor migas fase produksi = The effect of implementation plan of development pod base mechanism toward unrecovered cost from perspective oil and gas production phase contractor
2018
 UI - Tesis (Membership)
Tagliaferri, Louis E.
Creative cost improvement for managers / Louis E. Tagliaferri
John Wiley & Sons, 1981
 Buku Teks
O`Brien, James J.
Value analysis in design and construction
McGraw-Hill, 1976
 Buku Teks
Marpaung, Benny, author
Optimalisasi biaya sistem persediaan bahan baku di PT KWT unit bar mill-sirip.
1997
 UI - Skripsi (Membership)
<<   3 4 5   >>