Widia Retno Anggraini, author
Evaluasi penerapan metode prefabricated bathroom pada konstruksi highrise building terhadap kinerja waktu dan biaya berdasarkan risiko: studi kasus proyek Apartemen Parkland Avenue BSD PT. PP Pracetak = Evaluation of prefabricated bathroom method in highrise building construction which affects time and cost performance based on risk: case study Parkland Avenue Apartment project of PT. PP Pracetak
2016
 UI - Skripsi (Membership)
Wahyu Dwi Astuti, author
Hubungan Antara Persepsi Risiko Penyebaran COVID-19 Di Tempat Kerja Dengan Kecemasan Pada Pekerja Di Industri Hulu Migas Lapangan Hijau Pt. P, Tahun 2022 = Association Between COVID-19 Risk Perception and Anxiety at The Workplace on Oil & Gas Upstream Workers at Hijau Field PT. P, Year 2022
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2022
 UI - Tesis (Membership)
Cahya Tri Pambudi, author
Analisis dampak penggunaan metode gross split terhadap proses evaluasi biaya operasi kontraktor dan penerimaan migas bagian negara = Analysis on impact of gross split method to the process of evaluating contractor operating cost and oil and gas state revenue
Universitas Indonesia, 2019
 UI - Skripsi (Membership)
Galuh Rizma Maharani, author
Manajemen risiko biaya dan waktu pada pekerjaan struktur bawah dari proyek bangunan gedung betingkat tinggi di Jakarta = risk management on project cost and project time of substructure works in high-rise building project at Jakarta
Fakultas Teknik Universitas Indonesia, 2011
 UI - Skripsi (Open)
Prasetyo Bayu Murty, author
Manajemen kontrak berbasis risiko untuk mengendalikan biaya proyek pada proyek pengeboran darat onshore eksplorasi minyak dan gas bumi = Risk based contract management to control project cost of oil and gas exploration onshore drilling projects
Fakultas Teknik Universitas Indonesia, 2017
 UI - Tesis (Membership)
<<   2 3 4   >>