Feryan Fhadin, author
Strategi pengendalian waktu berbasis risiko dalam pelaksanaan proyek EPC (oil and gas) = Time control strategy based on risk in implementing EPC projects (oil and gas) (AB Project Study Case At PT. Y)
Fakultas Teknik Universitas Indonesia, 2010
 UI - Skripsi (Open)
Tarihoran, Andiga Dompak B., author
Evaluasi kompetensi manajer teknik berbasis risiko yang mempengaruhi kesuksesan proyek EPC minyak dan gas = Risk Based Engineering Manager Competency Evaluation that Affecting the Success of EPC Oil and Gas Project
Fakultas Teknik Universitas Indonesia, 2018
 UI - Tesis (Membership)
Harmadi, author
Pengembangan sistem kriteria evaluasi berbasis risiko dalam proses tender proyek Engineering Procurement Construction (EPC) di Perusahaan Oil & Gas = Development of Risk-Based Evaluation Criteria System in the Tender Process of Engineering Procurement Construction (EPC) Project in Oil & Gas Company
Fakultas Teknik Universitas Indonesia, 2019
 UI - Tesis (Membership)
Agung Andika Putra, author
Rekomendasi prosedur pengendalian biaya material berbasis risiko pada proyek EPC dalam upaya meningkatkan efisiensi biaya pelaksanaan proyek (Studi kasus proyek X pada PT. Y) = Recommendation of material cost control procedure based on risk in EPC project for increase execution cost efficiency (Case study project X, PT. Y)
Fakultas Teknik Universitas Indonesia, 2008
 UI - Tesis (Open)
Jefry Marihut Tandy, author
Analisis alur risiko pada proyek EPC minyak & gas onshore brownfield untuk meningkatkan kinerja waktu dengan metode structural equation modeling = Risk path analysis on EPC oil & gas onshore brownfield project to improve project time performance using structural equation modeling method
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
<<   1 2 3   >>