Alif Caesarrano Saifullah, author
Analisis kelayakan pendirian pabrik siklotron untuk keperluan medis = The feasibility studies of the establishment of cyclotron assembly plant to support cyclotron's medical uses
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi (Membership)
Hyundianto Arif Gunawan, author
Pengaruh variasi parameter Lead Rubber Bearing (LRB) base isolation pada penggunaan di pondasi bangunan nuklir cyclotron terhadap beban gempa di Indonesia = Effect of variations in Lead Rubber Bearing (LRB) base isolator parameters on use in cyclotron nuclear building foundations against earthquake loads in Indonesia
Fakultas Teknik Universitas Indonesia, 2019
 UI - Tesis (Membership)
Andri Putrantomo, author
Analisis Kelayakan Finansial Pendirian Bengkel Rekondisi Komponen Alat Berat PT. Trakindo Utama = Financial Feasibility Analysis of Establishment Heavy Equipment Component Recondition Workshop PT. Trakindo Utama
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi (Membership)
Risnaldi, author
Analisis kelayakan pengembangan klinik Bidakara Medical Center dalam perencanaan pendirian rumah sakit di Jakarta Selatan Tahun 2011 = Feasibility analysis of Bidakara Medical Centre to be developed as a hospital in South Jakarta year 2011
Universitas Indonesia, 2011
 UI - Tesis (Open)
Reza Effendi, author
Analisis kelayakan inbvestasi pendirian pabrik sepatu olahraga di Indonesia
Fakultas Teknik Universitas Indonesia, 2009
 UI - Skripsi (Open)
<<   1 2 3   >>