Resi Aseanto, author
Stakeholder manajemen pada proyek pembangunan pipa gas terhadap kinerja waktu dan biaya di PT. XYZ yang berbasis PMBOK = Stakeholder management on gas pipeline construction project against time and cost performance at PT. XYZ based on PMBOK / Resi Aseanto
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Archivito Aryo Santoso, author
Pengembangan prosedur perencanaan dan pengendalian proyek pengeboran sumur Gas di Lapangan Gas XYZ Berbasis PMBOK 2017 untuk Meningkatkan Kinerja Waktu (Studi Kasus Proyek Pengeboran Sumur Lapangan Gas XYZ di Papua Barat) = The development of planning and controlling procedure for gas well drilling projects to improve time performance based on PMBOK 2017 (Case Study of XYZ Gas Field Well Drilling Project in West Papua)
Fakultas Teknik Universitas Indonesia, 2020
 UI - Tesis (Membership)
Delvia Jessica, author
Implementasi pendekatan level dari inherently safer design menggunakan justifikasi benefit and cost analysis terhadap rencana pembangunan infrastruktur transmisi gas bumi antar pulau jarak dekat = Level approach implementation of inherently safer design using benefit and cost analysis justification of natural gas infrastructure development plan at short distance inter island transmission
Universitas Indonesia, 2016
 UI - Tesis (Membership)
Akmaluddin, author
Pemodelan estimasi biaya kontingensi operasi & pemeliharaan jalur pipa gas distribusi di PT XYZ = Modeling of line Operation & maintenance contingency cost estimates gas pipe distribution at PT XYZ
Fakultas Teknik Universitas Indonesia, 2021
 UI - Tesis (Membership)
Eni Juliana, author
Desain teknis dan analisis keekonomian pengembangan jaringan pipa distribusi gas alam milik PT X di Wilayah Kabupaten Tangerang = Technical design and economic analysis for development of natural gas distribution pipeline owned PT X in Kabupaten Tangerang region
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
<<   1 2 3   >>