Sherly, author
Merangking peralatan kritis di pembangkit listrik tenaga panas bumi area Kamojang unit A dengan menggunakan metode analytic hierarchy process (AHP) dan metode fuzzy borda count (FBC) = Ranking of critical equipment in geothermal power plants Kamojang unit A using analytic hierarchy process (AHP) method and fuzzy borda count (FBC) method
Fakultas Teknik Universitas Indonesia, 2017
 UI - Skripsi (Membership)
Hutapea, Hardyin Alexander, author
Pemeringkatan Faktor Penentu Keberhasilan Requirements Engineering Menggunakan Metode Analytic Hierarchy Process (AHP) = Ranking The Critical Success Factors of Requirements Engineering Using The Analytic Hierarchy Process (AHP) Method
Fakultas Ilmu Komputer Universitas Indonesia, 2022
 UI - Tugas Akhir
Shinta Juliastri, author
Analisis penentuan supplier dengan metode integrasi fuzzy analytic hierarchy process (F-AHP) dan goal programming pada perusahaan yang menerapkan green supply chain management = Green supplier selection analysis using an integrated method of fuzzy analytic hierarchy process (F-AHP) and goal programming
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
 UI - Tesis (Membership)
Tania Mentari Desriyani, author
Analisis model klasifikasi kondisi turbin pembangkit listrik tenaga panas bumi area Kamojang unit A dengan metode pendekatan machine learning untuk menentukan jadwal Overhaul = Analysis of classification model of turbine's condition in geothermal power plant area Kamojang unit A using machine learning method to determine the overhaul schedule
Fakultas Teknik Universitas Indonesia, 2018
 UI - Skripsi (Membership)
Septian Khairul Masdi, author
Analisis exergy, optimasi exergoeconomic dengan metode multiobjective, dan optimasi steam ejector pembangkit listrik tenaga panas Bumi Kamojang unit 4 = Exergy analysis, exergoeconomic optimization with multiobjective method, and steam ejector optimization of unit 4 Kamojang geothermal power plant
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)
<<   1 2 3   >>