Mellynia Tri Sugiarti
Pengaruh durasi buka reject kemasan terhadap peningkatan overall equipment effectiveness (OEE) pada proses striping mesin chentai APM 320 = Effect of opening rejected packaging duration on overall equipment effectiveness (OEE) improvement in chentai APM 320 machine stripping process
Fakultas Farmasi Universitas Indonesia, 2022
 UI - Tugas Akhir
Najmi Afriandini
Pengurangan waktu setup proses printing dengan menggunakan konsep single minute exchange of dies pada industri grafik printing = Reducing setup time of printing process by using single minute exchange of dies concept in graphic printing industry
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi Membership
Syafrizal Syarief
Pengukuran overall Equipment Effectiveness (OEE) dengan LabVIEW 8.5 sebagai pengendali maintenance = Measurement of Overall Equipment Effectiveness (OEE) With LabVIEW 8.5 as a maintenance controller
Fakultas Teknik Universitas Indonesia, 2010
 UI - Tesis Open
Hanif Fikri Fakhrurrozi
Pengukuran dan analisis overall equipment effectiveness pada perusahaan pelumas = Measurement and analysis of overall equipment effectiveness in lubricant company
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi Membership
Tiara Shinta Raharkandi
Analisis Kehandalan dan Overall Equipment Effectiveness-Machine Effectiveness pada Crawler Crane SCX 1200 untuk meningkatkan Maintenance Performance Level (MPL) = Reliability Analysis and Overall Equipment Effectiveness-Machine Effectiveness Crawler Crane SCX 1200 to Increase Maintenance Performance Level (MPL)
Fakultas Teknik Universitas Indonesia, 2023
 UI - Tesis Membership