Constructability concepts file / Construction Industry Institute
The University of Texas at Austin, [date of publication not identified]
 Buku Teks
Integrated management approach of construction project control : a case study in PT. Hutama Karya
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1995
 UI - Skripsi (Membership)
Yan Indra Gunawan
Pemodelan partial least square kebijakan perusahaan kompetensi manajemen proyek dan tingkat maturity manajemen proyek terhadap kinerja proyek pada tahap kostruksi di Jakarta = modeling of partial least square company policy project management competence and project management maturity level of performance project on stage construction in Jakarta
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Agustinus Putranto
Analisa peran manajemen proyek konstruksi untuk meningkatkan kinerja proyek dengan structural equation modeling (SEM) berbasis construction extension of the PMBOK guide 2016 = Analysis of the role of construction project management to improve project perfomance with structural equation modeling based construction extension of the PMBOK guide 2016 / Agustinus Putranto
Fakultas Teknik Universitas Indonesia, 2017
 UI - Tesis (Membership)
Arief Hendratno
Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT. X
Fakultas Teknik Universitas Indonesia, 2011
 UI - Tesis (Open)