Yusuf Latief
Preliminary cost estimation using regression analysis incorporated with adaptive neuro fuzzy inference system
Faculty of Engineering, Universitas Indonesia, 2013
 Artikel Jurnal
I Made Anggara Wijayatman
Optimasi biaya dalam penentuan jumlah pekerja pada proses zone picking di gudang distribusi Fast Moving Consumer Goods (FMCG) PT X dengan pendekatan Full Time Equivalent (FTE) dan Integer Linear Programming (ILP) = Cost optimization in determining the number of workers in the zone picking process at PT X Fast Moving Consumer Goods (FMCG) distribution warehouse with Full-Time Equivalent (FTE) and integer linear programming approaches
Fakultas Teknik Universitas Indonesia, 2022
 UI - Tesis (Membership)
Muhammad Rizki Hadi Putra
Identifikasi faktor-faktor yang berpengaruh terhadap tingkat akurasi estimasi biaya tahap konseptual pada proyek konstruksi bangunan gedung = Identification of factors that affect the level of conceptual phase cost estimation accuracy in building construction projects
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)
Remi Fitriadi Kurnia
Pengembangan standar WBS (Work Breakdown Structure) jembatan beton precast untuk estimasi biaya berbasis risiko = The Development of risk-based standardized WBS (Work Breakdown Structure) for cost estimation of concrete precast bridge construction
Fakultas Teknik Universitas Indonesia, 2017
 UI - Tesis (Membership)
Pardede, Dickson Marusaha
Analisis yuridis peraturan menteri pekerjaan umum dan perumahan rakyat nomor: 11/PRT/M/2019 tentang sistem perjanjian pendahuluan jual beli rumah terhadap kepemilikan hunian = Juridical analysis of regulation of the minister of public works and public housing number: 11/PRT/M/2019 concerning the system preliminary agreement to buy and sell houses against house ownership.
Fakultas Hukum Universitas Indonesia, 2020
 UI - Tesis (Membership)