Tifani Tandean
Optimasi biaya penjadwalan multi-proyek pada sebuah perusahaan manufaktur mesin engineer-to-order (ETO) = Cost optimization of multi project scheduling in a machine manufacturer engineer-to-order (ETO)
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Reza Wahyuherma
Evaluasi sistem penilaian existing green building di Indonesia dengan metode life cycle assessment untuk merubah existing building meraih sertifikasi hijau = Evaluation of existing green building rating tools in Indonesia with life cycle assessment method for existing buildings conversion to get green certification
2017
 UI - Tesis (Membership)
Sri Wijoyo Mahardhiko
Penilaian keefisienan penggantian motor induksi industri pengolahan garam dengan metode LCC (Life Cycle Cost) = Replacement of the induction motors with efficiency assessment using life Cycle cost method
2016
 UI - Skripsi (Membership)
Mu'thi Abdillah
Optimalisasi Offshore Workover Rig Barge dalam Menunjang Kegiatan Operasi Sumur Minyak dan Gas di Perusahaan CNOOC SES Ltd dengan Menggunakan Metode Mixed Integer Programming = Offshore Workover Rig Barge Optimization in Supporting Oil and Gas Well Operation Activity in CNOOC SES Ltd using Mixed Integer Programming Method
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018
 UI - Tesis (Membership)
Reyhan Fadilaputra Nurhadian
Analisis Life Cycle Cost Perbandingan antara Metode Tradisional In-Situ dan Sistem Hybrid memanfaatkan Pod Modular Kamar Mandi menggunakan ICMS (Standar Pengukuran Konstruksi Internasional) Edisi ke-2 di Brisbane = Life Cycle Cost Analysis of Three-Story Building Comparison between Traditional Method In-Situ Method and Hybrid Systems Method Utilizing Bathroom Modular Pods using ICMS (International Construction Measurement Standards) 2nd Edition by RICS in Brisbane
Fakultas Teknik Universitas Indonesia, 2022
 UI - Tesis (Membership)