Kemal Gibran
Case study for upgrading the design of impressed current cathodic protection for tank bottoms as an external corrosion control method
Faculty of Engineering, Universitas Indonesia, 2016
 Artikel Jurnal
Felix Cahyo Kuncoro Jakti
Analisis perbandingan biaya dan waktu pelaksanaan tiang pancang dan tiang bor studi kasus perencanaan Rumah Sakit Kelas B Bandung = Comparison analysis of cost and time of driven and bored pile works Bandung Class B Hospital design study case
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi Membership
International to engineering design / Arvid R. Eide, Roland D. Jenison
McGraw-Hill, 1998
 Buku Teks
Ambari
Perbaikan proses inspeksi produk SCV connector menggunakan pendekatan line balancing : studi kasus pada PT. XYZ = Process improvement inspection product of SCV connector using line balancing approach : a case study in PT. XYZ
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi Membership
Ignatius Yuli Saptana
Pengaturan iterasi engineering pada proyek EPC pembangunan local control room (LCR) building untuk meminimalkan rework dengan metode design structure matrix (DSM) = Structuring the iteration in engineering for local control room (LCR) building epc project with design structure matrix (DSM) method
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis Membership