Nara Adhisthana
Penilaian tingkat kematangan proyek konstruksi stasiun instrumen meteorologi dengan menggunakan pendekatan Sustainable Construction = Assesing the maturity level of a meteorological instrument station construction project using the Sustainable Construction approach
Fakultas Teknik Universitas Indonesia, 2020
 UI - Skripsi (Membership)
Almas Kurnia Listiyanto
Analisa risiko pengadaan material dengan menggunakan kontrak cost insurance and freight (CIF)pada proyek engineering procurement construction (EPC) terhadap kinerja biaya proyek = Risk analysis of procurement using cost insurance and freight (CIF) on engineering procurement construction project (EPC) affecting to project cost performance index
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)
Buyung Prakarsa Perdana
Pengaruh peran project management office (PMO) pada tingkatan multiple project terhadap kinerja proyek epc = Project management office (PMO) assessment on multiple project level affecting engineering procurement and construction (EPC) project performance
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis (Membership)
Muhammad Nizam Khadid
Analisa level kematangan berbasis sustainable construction pada proyek konstruksi pembangunan gedung (Studi Kasus: Pembangunan Gedung Training Center Camp Al-Azhar yang Dilakukan PT. Berkah Gemilang) = Maturity level analysis with sustainable construction approach in building construction projects (Case Study: Construction of Al-Azhar Training Center Camp Building Conducted by PT. Berkah Gemilang)
Fakultas Teknik Universitas Indonesia, 2020
 UI - Skripsi (Membership)
Aryartha Soepardi
Pengembangan proses perencanaan pengadaan peralatan dan material di proyek engineering procurement construction (epc) untuk peningkatan kinerja waktu = Improvement procurement planning process of equipments and materials in engineering procurement construction (epc) project to enhance time performance
Fakultas Teknik Universitas Indonesia, 2019
 UI - Tesis (Membership)