Nanang Tri Wahyuna
Strategi Pemeliharaan Pada Sistem Boiler Pembangkit Listrik Tenaga Uap (PLTU) Berdasarkan Reliability Centered Maintenance (RCM) = Maintenance Strategy on The Boiler System Steam Power Plant Based on Reliability Centered Maintenance (RCM)
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
Ardie Nirvansyah
Simulasi perangkat buck-boost converter untuk turbin angin dengan pengendali logika fuzzy = Simulation of fuzzy logic controlled buck boost converter system for wind turbine
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)
Arini Nikitasari
Ketahanan korosi sumuran CA6NM sebagai material sudu turbin pembangkit listrik geotermal = Pitting corrosion resistance of CA6NM as turbine blade material for geothermal power plant / Arini Nikitasari
2019
 UI - Tesis (Membership)
Mohammad Dicky Amrullah
Penilaian reliability pembangkit listrik tenaga panas bumi (PLTP) 60 megawatt = Reliability assesment of 60 megawatt geothermal power plant
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi Membership
Tomy Kusbianto
Sistem pengendalian multi Input multi output pada sistem penerangan cahaya menggunakan metode fuzzy logic
Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2006
 UI - Skripsi (Membership)