Hery Wahyudi Wibowo
Analisis biaya siklus hidup PLTU dengan metode weibull untuk peningkatan faktor ketersediaan pembangkit = Coal fired power plant s life cycle cost analysis using weibull methods to increase the availability factor / Hery Wahyudi Wibowo
2016
 UI - Tesis Membership
Muhammad Lukmanul Hakim
Studi Kelayakan Repurposing PLTU Menjadi Pembangkit Berbasis Surya dan Biomassa dengan Pendekatan Cost-Benefit Analysis dan Analisis Rancangan Sistem Kelistrikan = Feasibility Study of Repurposing a Coal-Fired Power Plant into a Solar and Biomass-Based Power Plant Using Cost-Benefit Analysis and Power System Design Analysis
Fakultas Teknik Universitas Indonesia, 2025
 UI - Skripsi Membership
Yazeedrana Pancasakti
Environmental impact analysis of Coal-Fired and Gas-Fired power generation using Life-Cycle Assessment Method : a comparison study in PT X = Analisis dampak lingkungan pembangkit listrik berbahan bakar batubara dan gas alam dengan Metode Life-Cycle Assessment : studi perbandingan di PT X
Fakultas Teknik Universitas Indonesia, 2022
 UI - Skripsi Membership
Dinda Pratiwi
Analisis kebijakan pajak karbon atas PLTU batubara (coal-fired) di Indonesia= Analysis of carbon tax policy on coal-fired power plant in Indonesia
Fakultas Ilmu Administrasi Universitas Indonesia, 2022
 UI - Skripsi Membership
Wibisana Bagus Santosa
Analisis pendanaan proyek PT. PLN (Persero) studi kasus pembangkit listrik tenaga uap (PLTU) Indramayu = Project financing analysis of PT. PLN (Persero) study case on Indramayu coal-fired power plant project
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
 UI - Tesis Open