Ajang Indra
Analisis Risiko Pada Fasilitas Normally Unmanned Installation (NUI) Menggunakan Metode Semi Quantitative Risk Analysis (SQRA) = Risk Analysis On Normally Unmanned Installation (NUI) Facilities Using Semi Quantitative Risk Analysis SQRA Method
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi (Membership)
Siagian, Stewart Pardamean
Analisis kesesuaian antara identifikasi bahaya dan penilaian risiko risk assessment keselamatan kerja dengan program kerja dan indikator kinerja keselamatan departemen workshop PT XYZ di Cikarang = Analysis of compliance between hazard identification and risk assessment work safety with safety program and safety performance indicators workshops department of PT XYZ in Cikarang
Universitas Indonesia, 2018
 UI - Tesis (Membership)
Endong Darwilisan Yahya
Analisis identifikasi bahaya dan penilaian risiko pada warehouse PT Taisho Pharmaceutical Indonesia, Tbk. tahun 2015 = Analysis hazard identification risk assessment on warehouse PT Taisho Pharmaceutical Indonesia, Tbk. in the year of 2015
Universitas Indonesia, 2015
 UI - Skripsi (Membership)
Annisa Cantika
Penyusunan prioritas pengendalian bahaya kesehatan berdasarkan penilaian risiko kesehatan dan analisis sumber daya di area gas plant dan power plant PT X Tahun 2014 = Setting priorities to control health hazard based on health risk assessment and analysis of resources in gas plant and power plant area of PT X year 2014
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
 UI - Skripsi (Membership)
Diantika Prameswara
Kajian hazard identification, risk assessment and determining control (HIRADC) di PT. X tahun 2018 = Study of hazard identification, risk assessment and determining control (HIRADC) PT. X 2018
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018
 UI - Tesis (Membership)