Roberta Fifin Amandaningrum
Penggunaan metode time-driven activity based costing untuk penghitungan biaya tindakan endoskopi di Rumah Sakit XYZ = Time-driven activity based costing method for calculating cost of endoscopy services in XYZ Hospital
Fakultas Eknonomi dan Bisnis Universitas Indonesia, 2019
 UI - Tesis (Membership)
Walujo Pambudi
Penyusunan standar biaya keluaran berdasarkan time driven activity based costing untuk efisiensi biaya dalam penerapan penganggaran berbasis kinerja di unit pelaksana teknis monitoring spektrum frekuensi radio ditjen sumber daya dan perangkat pos dan informasi = Preparation standard output costs based on time driven activity based costing for cost efficiency in the implementation of performance based budgeting in the technical unit radio frequency spectrum monitoring directorate general of resources and equipment post and information
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013
 UI - Tesis (Membership)
Bintang Nugroho
Penerapan Time-Driven Activity-Based Costing sebagai Teknik Penentuan Biaya dan Harga Layanan Jasa pada Agensi Pemasaran Digital Kreatif = Implementation of Time-Driven Activity-Based Costing for Service Pricing in A Digital Creative Marketing Agency
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
 UI - Tesis (Membership)
Khansa Fatin
Analisis Dasar Alokasi Biaya Selisih Kurs pada PT X dengan Metode Activity Based Costing (Studi Kasus pada Perusahaan Makanan dan Minuman) = Analysis of Cost Allocation for Exchange Rate Translation at PT X using Activity-Based Costing Method (Case Study on a Food and Beverage Company)
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
 UI - Tesis (Membership)
Novi Nurul Fatimah
Analisis sistem akuntansi biaya tradisional dan desain activity based costing pada perusahaan manufaktur studi kasus: PT X = Traditional costing system analysis and design of activity based costing in manufacturing company case study PT. X / Novi Nurul Fatimah
2015
 UI - Tesis (Membership)