Riezka Hadwiansyah
Structural Equation Model (SEM) Hubungan antara Work Breakdown Structure (WBS), Metode Kerja dan Risiko Terhadap Biaya K3 pada Proyek Rusunawa = Structural Equation Model (SEM) Correlation between Work Breakdown Structure (WBS), Work Method and Risk Towards Cost of Safety on Construction of Apartment Project.
Fakultas Teknik Universitas Indonesia , 2020
 UI - Tesis (Membership)
Nurul Inayah Wardahni
Structural equation model hubungan antara kebijakan, Work Breakdown Structure (WBS), pedoman, sistem informasi, dan Building Information Modeling (BIM) terhadap kinerja pemeliharaan pada bangunan gedung tinggi = Structural equation model of relationship between policy, Work Breakdown Structure (WBS), guidelines, information systems, and Building Information Modeling (BIM) on maintenance perfomance of high rise building
Fakultas Teknik Universitas Indonesia, 2020
 UI - Tesis (Membership)
Maretha Piselia
Implementasi BIM 4D dalam Meningkatkan Kinerja Proyek EPC Ditinjau dari Sudut Pandang Kontraktor [Studi Kasus Pada PT. XY] = Implementation of 4D BIM in Improving EPC Project Performance from Contractorss Perspective Views [A Case Study PT.XY].
Fakultas Teknik Universitas Indonesia, 2020
 UI - Tesis (Membership)
Susanto
Pengaruh karakteristik individu terhadap upah pekerja konstruksi = Effects of individual characteristics on the wages of construction workers / Susanto
2015
 UI - Tesis (Membership)
Ressa Adrian Bernessa
Analisa struktur biaya keselamatan dan kesehatan kerja pada proyek infrastruktur jalan berbasis work breakdown structure = Analysis of occupational health and safety cost structure in the road infrastructure project based on work breakdown structure
Fakultas Teknik Universitas Indonesia, 2020
 UI - Tesis (Membership)