Surya Budi Ariyadi
Analisis Tekno-Ekonomi Strategi Pengembangan Pembangkit Listrik Tenaga Surya Solar PV Ground Mounted 10 MW Terkoneksi Jaringan Di Jawa Tengah = Techno-Economic Analysis of Grid-Connected 10 MW Ground Mounted Solar PV Power Plant Development Strategy in Central Java
Fakultas Teknik Universitas Indonesia, 2024
 UI - Tesis Membership
Andrea Ramadhan
Analisa kinerja pulverized coal boiler di pltu kapasitas 3x315 mw = Performance evaluation of pulverized coal boiler in 3x315 mw power plant
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi Membership
Suraji
Study performance and combustion characteristic of tiny-oil burner system at Coal Fired Steam Power Plant (CFSPP) 2x300 mw = Kajian kinerja dan karakteristik pembakaran pada sistem tiny-oil burner di PLTU 2x300 mw
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis Membership
Fasri Hatomi
Pengembangan Energi Terbarukan Pembangkit Listrik Tenaga Surya (PLTS) Kapasitas 50 MW Dengan Skema KPBU-AP dan IPP di Ibukota Negara (IKN) = Development of Solar Power Plant With Capacity 50 MW by Availability payment Public Private Partnership (PPP-AP) and Independent {
Fakultas Teknik Universitas Indonesia, 2024
 UI - Tesis Membership
Siti Astari Pratiwi
Pengaruh Parameter Kritis Pada Kinerja PLTU 100 MW = Influence of Critical Parameters on Power Plant Performance of 100 MW
Fakultas Teknik Universitas Indonesia, 2017
 UI - Skripsi Membership