Eben Henry R.
Analisa peningkatan kapasitas produksi pada line assembling transmisi PT. X dengan metode line balancing = Analysis of production capacity improvement at transmission assembly lines of PT. X with line balancing method
Fakultas Teknik Universitas Indonesia, 2011
 UI - Skripsi Open
Febri Laurent Susilowati Larosa
Praktik kerja di PT. Dankos Farma periode Bulan Januari-Maret 2021 : time study proses Set Up Clean Up (SUCU) pada mesin granulasi di Production Line 03 PT. Dankos Farma = Internship at PT. Dankos Farma period Januari-March 2021 : time study of the Set Up Clean Up (SUCU) process on granulation machine at Production Line 03 PT. Dankos Farma
Fakultas Farmasi Universitas Indonesia, 2021
 UI - Tugas Akhir
Caroline Christina
Praktik Kerja di PT. Dankos Farma periode 11 Januari-5 Maret 2021 "Increase Capacity dan Closed Corrective Action and Preventive Action (CAPA) di Production Line 01 PT. Dankos Farma" = Internship at PT. Dankos Farma 11 January-5 March 2021 Period "Increase Capacity and Closed Corrective Action and Preventive Action (CAPA) on Production Line 01 PT. Dankos Farma"
Fakultas Farmasi Universitas Indonesia, 2021
 UI - Tugas Akhir
Alfanso Theodore
Penggunaan Multi Dimensional Scaling di Dalam Riset Pemasaran Mountain Bike : Studi Kasus PT Citra Asri Buana
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1995
 UI - Skripsi Membership
Bunga Atqiya Qutrunnada
Analisis Tingkat Pemahaman Personil terhadap Matriks Kompetensi di Area Produksi PT Bintang Toedjoe Pulogadung = Analysis of Personnel's Understanding of Competency Matrix in The Production Area of PT Bintang Toedjoe Pulogadung
Fakultas Farmasi Universitas Indonesia, 2023
 UI - Tugas Akhir