Todung Frederico
Evaluasi tahapan design and build pada pembangunan infrastruktur jalan tol trans Sumatera berbasis risiko untuk meningkatkan kinerja waktu = Risk-based evaluation of design and build stages in trans Sumatera toll road infrastructure development to improve time performance
Fakultas Teknik Universitas Indonesia, 2022
 UI - Tesis (Membership)
Transportation facilities : new concepts in architecture and design
Mesei Publications , 1997
 Buku Teks
Adwina Desiyandri
Evaluasi sistem manajemen mutu proses pembangunan jembatan berbasis risk di lingkungan Direktorat Jembatan Kementerian PUPR = Risk based evaluation of bridge construction quality management system in the bridge directorate ministry of public work and housing
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
Adhelia Putri Firdauzi
Evaluasi sistem manajemen mutu berbasis risk pada proses perencanaan jembatan di lingkungan Direktorat Jembatan Kementerian PUPR = Risk based evaluation of quality management system of bridge designing process in bridge directorate ministry of public work and housing / Adhelia Putri Firdauzi
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
Dinda Rahmania
Analisa dampak alokasi anggaran infrastruktur Kementerian PUPR terhadap perekonomian nasional = Impact analysis of Ministry of Public Works and Housing infrastructure budget allocation on national economy
2018
 UI - Skripsi (Membership)